Skip to main content

Hong Kong’s rail terminus goes ahead

With a total area of over 380,000 square meters, the multi-storey West Kowloon rail terminus, the majority of it located underground, will be larger than most airport terminals, and capable of handling around 99,000 passengers per day. The first trains are expected to run from 2015. The Hong Kong section of the express rail link, operating at up to 200 km per hour, will connect Hong Kong with the capital Beijing over 2,000 kilometers away, passing via Shenzhen, Guangzhou and Wuhan.
October 5, 2012 Read time: 2 mins
With a total area of over 380,000 square meters, the multi-storey West Kowloon rail terminus, the majority of it located underground, will be larger than most airport terminals, and capable of handling around 99,000 passengers per day.

The first trains are expected to run from 2015. The Hong Kong section of the express rail link, operating at up to 200 km per hour, will connect Hong Kong with the capital Beijing over 2,000 kilometers away, passing via Shenzhen, Guangzhou and Wuhan.

A safety glass and steel roof structure spans the building and provides daylight to the terminus with its duty-free shops, restaurants and waiting lounges; the design was a winner in the 2010 World Architecture Festival and also won a 2012 MIPIM Award.

Eighty-one escalators and moving walks will transport travellers and visitors throughout the new terminus and to the station's fifteen platforms. An eco-friendly energy saving system reduces the speed whenever there are no passengers. Depending on passenger volumes this can create energy savings of up to 60%.

Related Content

  • Shock therapy: jolt for EV charging needed
    October 2, 2018
    As sales of electric vehicles accelerate, the growth of charging infrastructure is in need of a big boost. Graham Anderson reports on whether Europe is up to it. Utilities, technology companies and vehicle manufacturers are battling to put in place new charging networks for electric vehicles (EVs) across Europe in response to a predicted dramatic surge in demand. Market experts believe that rapidly falling battery costs – which make up about one third of the costs of an electric car – and growing
  • Go-ahead for Richmond-to-Raleigh high-speed rail proposal
    September 21, 2015
    The US Department of Transportation (DOT)’s Federal Railroad Administration (FRA), the State of North Carolina and the Commonwealth of Virginia have signed off on the Final Environmental Impact Statement (FEIS) for the proposed Richmond to Raleigh (R2R) passenger rail line along the Southeast Corridor. The completion of the FEIS is one of the final steps necessary before construction of the project can move forward once funding is secured. The 162-mile route between the two cities would utilise existing
  • Transition to all electronic tolling leads to cost savings
    February 2, 2012
    How a temporary congestion-relief solution resulted in the North Texas Tollway Authority's transition to all-electronic toll collection and potential savings of up to $472 million by 2045. By Carla Kienast, ETC Corporation
  • Network of associations
    December 18, 2015
    Snowmageddon response sweeps award, New push for seamless European travel, Young professionals group launched at ITS UK and Green transport initatives