Skip to main content

At-home charging for new Fiat 500e

Fiat has selected AeroVironment as its preferred provider of home charging stations and installations for its all-electric Fiat 500e. The 2013 Fiat 500e features a 24-kWh Lithium-ion battery that will allow drivers to travel an estimated 108 miles and uses an industry-standard SAE J1772 recharge connector. The 240-volt refuelling station will charge the car in four hours or less versus the approximate twenty hours required using a standard 120-volt charging cable. AeroVironment’s UL-listed station can
August 22, 2013 Read time: 2 mins
1674 Fiat has selected 2132 AeroVironment as its preferred provider of home charging stations and installations for its all-electric Fiat 500e.

The 2013 Fiat 500e features a 24-kWh Lithium-ion battery that will allow drivers to travel an estimated 108 miles and uses an industry-standard SAE J1772 recharge connector.  The 240-volt refuelling station will charge the car in four hours or less versus the approximate twenty hours required using a standard 120-volt charging cable.  AeroVironment’s UL-listed station can be installed indoors or outdoors, making it easy to locate the station in the most convenient location.  

“The Fiat 500e increases the number of plug-in electric vehicles available to American drivers,” said Wahid Nawabi, AeroVironment senior vice president and general manager of its Efficient Energy Systems business segment. “Having your own auto refuelling station right in your garage or driveway gives EV drivers a new kind of freedom. It makes charging your car as easy as charging your cell phone, and it’s much less expensive than gasoline.”

Related Content

  • April 19, 2012
    Another section of West Coast Green Highway EV charging infrastructure announced
    The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
  • May 18, 2012
    EVs stir interest but face obstacles – IBM study
    Many automobile industry executives believe that sales of traditional vehicles will peak before 2020 and are looking to electric-only vehicles (EVs) as one of the next hot products, but they will first have to address stringent consumer requirements about EV performance, recharging, and convenience, according to a new IBM survey of consumer attitudes and a recent study of auto industry executives.
  • October 2, 2018
    Shock therapy: jolt for EV charging needed
    As sales of electric vehicles accelerate, the growth of charging infrastructure is in need of a big boost. Graham Anderson reports on whether Europe is up to it. Utilities, technology companies and vehicle manufacturers are battling to put in place new charging networks for electric vehicles (EVs) across Europe in response to a predicted dramatic surge in demand. Market experts believe that rapidly falling battery costs – which make up about one third of the costs of an electric car – and growing
  • April 20, 2012
    ODoT selects AeroVironment for ‘Green Highway’
    AeroVironment has been selected by the Oregon Department of Transportation (ODoT) to install its high-power Level 3 electric vehicle (EV) fast charging stations along the I-5 corridor from the California state line to the Willamette Valley. This is the beginning of the “Green Highway,” a vision for safe and consistent charging infrastructure spanning the West Coast, allowing EV drivers to travel with confidence from San Diego to Vancouver in Canada.