Skip to main content

Ho Chi Minh City plans rapid bus system

As part of an initiative to develop a modern transport system for Ho Chi Minh City, the municipal administration plans to spend around US$152 million on a bus rapid transit (BRT) project that will run along the 25km Vo Van Kiet – Mai Chi Tho boulevard, connecting the eastern and western parts of the city. The BRT system is expected to have 30 modern buses and, according to the municipal transport department, is a feasible solution for traffic congestion problems. A green corridor that will use solar energy
October 23, 2012 Read time: 2 mins
As part of an initiative to develop a modern transport system for Ho Chi Minh City, the municipal administration plans to spend around US$152 million on a bus rapid transit (BRT) project that will run along the 25km Vo Van Kiet – Mai Chi Tho boulevard, connecting the eastern and western parts of the city.

The BRT system is expected to have 30 modern buses and, according to the municipal transport department, is a feasible solution for traffic congestion problems.  A green corridor that will use solar energy and have trees planted at all stations will also be part of the project.

A draft project document will be delivered to the Ministry of Planning and Investment by late October 2012. By the beginning of 2014, it is projected that the management board of the 2000 World Bank will approve the BRT project and in the same year, it will be submitted to the government for placing in the Official Development Aid (ODA) list.

Of the US$152 million, the World Bank will be funding US$10 million which will be used for human resources training and to develop the public transport administration. The balance of US$142 million will be loaned from the International Bank of Reconstruction and Development (IBRD) for infrastructure construction, including parking lots, management systems, depots and elevated roads for pedestrians.

For more information on companies in this article

Related Content

  • Cost benefit: Toronto retimings tame traffic trauma
    July 19, 2018
    Canada’s largest city reckons that it is saving its taxpayers’ money simply by altering the way traffic lights work. David Crawford reviews Toronto’s ambitious plans to ease congestion Toronto, Canada’s largest metropolis (and the fourth largest in North America), has saved its residents CAN$53 (US$42.4) for every CAN$1 (US$0.80) spent over a 2012-2016 traffic signal retiming programme, according to figures released by its Transportation Services Division. The programme covered 1,275 signals (the city’s
  • Glasgow’s new Operations Centre has a key role in city’s future
    June 6, 2014
    David Crawford investigates a control centre with a future. Destined to play a central role in keeping the city and its transport running smoothly during the 2014 Commonwealth Games in July, the new Glasgow Operations Centre in Scotland’s largest urban centre formally went live earlier this year. The aim was to dry run its far-reaching integration of previously distinct core systems and familiarise the public with the initial phase of what will be a long-term post-event legacy. The centre brings together, i
  • Cost benefit: Toronto retimings tame traffic trauma
    July 11, 2018
    Canada’s largest city reckons that it is saving its taxpayers’ money simply by altering the way traffic lights work. David Crawford reviews Toronto’s ambitious plans to ease congestion. Toronto, Canada’s largest metropolis (and the fourth largest in North America), has saved its residents CAN$53 (US$42.4) for every CAN$1 (US$0.80) spent over a 2012-2016 traffic signal retiming programme, according to figures released by its Transportation Services Division. The programme covered 1,275 signals (the city’s to
  • Wi-Fi win-win for mass transit
    October 31, 2014
    David Crawford explores passenger and operator benefits of on-board Wi-Fi Urban commuters’ growing demand for continuous – and reliable - internet connectivity is spurring network operators into the rapid installation of high-grade Wi-Fi access on their surface and underground networks, as well as in their stations. Such moves are often a key part of strategies to maintain and increase ridership levels.