Skip to main content

Hitachi Rail Europe wins UK first traffic management contract

Passengers on some of the busiest commuter lines in the UK can look forward to more frequent and more reliable trains following a deal to provide new traffic management technology on the Thameslink route through central London. Network Rail and the Thameslink Programme have signed a contract with Hitachi Rail Europe (HRE) to deliver a step-change in technology through state-of-the-art traffic management technology.
July 28, 2015 Read time: 3 mins
Passengers on some of the busiest commuter lines in the UK can look forward to more frequent and more reliable trains following a deal to provide new traffic management technology on the Thameslink route through central London.

5021 Network Rail and the Thameslink Programme have signed a contract with 7427 Hitachi Rail Europe (HRE) to deliver a step-change in technology through state-of-the-art traffic management technology.

The new system will enable 24 trains per hour to run reliably through central London in each direction by 2018, allowing the Thameslink Programme to fulfil its ambition of revolutionising north-south travel through the capital.

HRE will supply Network Rail with a traffic management solution with options for the South East and London North Eastern programme, which will provide the framework for a blueprint to support the roll out of a full digital railway. This includes simulators, automatic routing systems and the Tranista traffic management platform.

Hitachi Rail’s traffic management systems support railway operations that can be reconfigured flexibly in keeping with passenger demand, to manage and control the running of the railway and support the rapid recovery of operations in the event of a delay or disruption.

Similar systems have been used on busy commuter networks in Japan, as well as the Shinkansen high speed lines and other main lines, for over 40 years.

Rail Minster Claire Perry said: “We are investing in the Thameslink programme because it will transform rail travel for customers in London and the south east, providing more seats and quicker journeys. It will also create thousands of jobs, making it a vital part of our long-term economic plan.

“Today’s announcement isn’t just about new technology, it’s a key way to improve customer journeys, by increasing reliability and making sure they have the right information at the right time. We have seen huge growth in the number of people travelling by train and this investment will play a key role in keeping those customers moving safely, reliably and comfortably.”

Thameslink Programme director Simon Blanchflower said: “Providing a frequent and reliable service through the heart of the city to a host of new destinations will only be possible thanks to this technology.

“Traffic management technology will provide extra guidance to our signallers and work with in-cab signalling and automatic train operation to deliver 24 trains per hour between London Blackfriars and St Pancras International. It will also improve the time it takes the railway to recover from delays and deliver enhanced customer information, to improve performance and passengers’ experience of our railway.”

Karen Boswell, managing director of Hitachi Rail Europe, said: “This is a fantastic achievement for Hitachi Rail in the UK, following on the back of the Class 395 high speed trains in 2009, the InterCity Express Programme (IEP) contract in July 2012 and Abellio’s ScotRail contract signed in March this year.  

“Hitachi Rail is determined to strengthen its railway-related business in the UK and I look forward to working with Network Rail to deploy our proven Traffic Management System, which will bring significant benefits to rail commuters.”

Thameslink Programme director Simon Blanchflower said: “Providing a frequent and reliable service through the heart of the city and to a host of new destinations will only be possible thanks to this technology.”
 
“Traffic management will provide extra guidance to our signallers and work with in-cab signalling and automatic train operation to deliver 24 trains per hour between London Blackfriars and St Pancras International. It will also improve the time it takes the railway to recover from delays and deliver fantastic customer information, to improve performance and passengers’ experience of our railway.”

Related Content

  • January 23, 2012
    Hard shoulder running aids uniform traffic flow and safer driving
    David Crawford detects a market for European experience. Well-established now in at least three European countries, Hard Shoulder Running (HSR) on motorways is exciting growing interest in the US. A November 2010 Report to Congress by the Federal Highway Administration (FHWA), on the Efficient Use of Highway Capacity, notes the role of HSR in the European-style Active Traffic Management (ATM) strategies now being recommended for implementation in the US where, until recently, they were virtually unknown.
  • January 26, 2012
    Vancouver's metro transport promotes alternatives to driving
    David Crawford looks at Vancouver and the legacy of a Olympic transport success
  • February 25, 2016
    System predicts train delays and informs response
    David Crawford looks into the near-term future for Stockholm’s rail commuters. Swedish rail operator Stockholmståg, which runs commuter services in and around the country’s capital, is claiming a world first with the introduction of its automated Pendelprognosen (commuter prognosis) service. Developed to enable the prediction of delays as much as two hours before they are likely to occur, this offers the operator the scope for much earlier remedial action than previously - for example by filling in the expe
  • December 19, 2017
    Bombardier supplies 60 Aventra vehicles for London Rail Structure
    Bombardier has signed a contract with Porterbook and C2c to supply 60 of its Aventra vehicles to be used on the C2c rail franchise from September 2021 with the intention of increasing capacity and improving journeys for commuters into London. The overall value of the rolling stock and maintenance and support services contract is valued £105m ($139m) and will run until November 2029.