Skip to main content

High speed rail signalling system contract win for Hollysys

In a contract valued at around US$10.75 million, Chinese provider of automation and control technologies, Hollysys Automation Technologies, is to supply the ground-based signalling system for the 357 km Guangdong section of the Xiamen-Shenzhen high-speed rail line which has a designed travelling speed of 200 km/h. Hollysys will provide the ground-based high-speed rail signaling system, including train control centres (TCC), line-side electronic units (LEU) and other auxiliary equipments, which are expected
January 9, 2013 Read time: 2 mins
In a contract valued at around US$10.75 million, Chinese provider of automation and control technologies, 7077 Hollysys Automation Technologies, is to supply the ground-based signalling system for the 357 km Guangdong section of the Xiamen-Shenzhen high-speed rail line which has a designed travelling speed of 200 km/h.

Hollysys will provide the ground-based high-speed rail signaling system, including train control centres (TCC), line-side electronic units (LEU) and other auxiliary equipments, which are expected to be delivered and installed by October 2013.

The Guangdong section of the Xiamen-Shenzhen line will start at the border between Fujian and Guangdong provinces, and travel to Shenzhen city via Chaozhou-Shantou region, Shanwei, Huizhou city and other cities. Once work on the section is completed, the full 502 km journey from Xiamen city to Shenzhen city will take three hours. It is believed that this line is of utmost importance to the local economy, because it brings three important special economic zones, Xiamen, Shantou, and Shenzhen together in a much more convenient, economic and faster way.

Dr Changli Wang, chairman and CEO of Hollysys, commented: "We are pleased to win this contract to supply the ground-based signaling equipments for the Guangdong section of the Xiamen-Shenzhen line. We believe that with our strong research and development and implementation capability and excellent track record, Hollysys will continue to benefit from China's restarted high-speed rail construction and create value for our shareholders”.

Related Content

  • August 19, 2014
    Big data bonus for Dublin’s buses
    Dublin’s smart research partnership speeds buses More than 50% of people travelling into and across the Irish capital rely on public transport, and four out of 10 these use buses meaning Dublin Bus carries some 120 million passengers a year.
  • October 5, 2012
    Hong Kong’s rail terminus goes ahead
    With a total area of over 380,000 square meters, the multi-storey West Kowloon rail terminus, the majority of it located underground, will be larger than most airport terminals, and capable of handling around 99,000 passengers per day. The first trains are expected to run from 2015. The Hong Kong section of the express rail link, operating at up to 200 km per hour, will connect Hong Kong with the capital Beijing over 2,000 kilometers away, passing via Shenzhen, Guangzhou and Wuhan.
  • January 27, 2012
    Integrate systems to reduce roadside infrastructure
    David Crawford reviews promising current developments. Instrumentation of the road infrastructure has grown to become one of the most dynamic sectors of the ITS industry. Drivers for its deployment include global concerns over the commercial and environmental pressures of traffic congestion, the importance of keeping drivers informed throughout their journeys, and the need to reduce accident rates and promote the safety of all road users, for example by enforcing traffic safety rules.
  • January 27, 2012
    Ramp metering delivers - again
    Though still controversial, ramp metering, which has been around for nearly 50 years, continues to deliver substantial benefits, and generally for relatively small cost. Kansas City is a case in point. In March 2010, Kansas City Scout, a partnership between the Missouri and Kansas Departments of Transportation to provide ITS for the greater Kansas City Area, activated the first ramp metering system in the region. The project is located on an 8.85km (5.5 mile) section of Interstate 435 from Metcalf Avenue to