Skip to main content

High speed rail signalling system contract win for Hollysys

In a contract valued at around US$10.75 million, Chinese provider of automation and control technologies, Hollysys Automation Technologies, is to supply the ground-based signalling system for the 357 km Guangdong section of the Xiamen-Shenzhen high-speed rail line which has a designed travelling speed of 200 km/h. Hollysys will provide the ground-based high-speed rail signaling system, including train control centres (TCC), line-side electronic units (LEU) and other auxiliary equipments, which are expected
January 9, 2013 Read time: 2 mins
In a contract valued at around US$10.75 million, Chinese provider of automation and control technologies, 7077 Hollysys Automation Technologies, is to supply the ground-based signalling system for the 357 km Guangdong section of the Xiamen-Shenzhen high-speed rail line which has a designed travelling speed of 200 km/h.

Hollysys will provide the ground-based high-speed rail signaling system, including train control centres (TCC), line-side electronic units (LEU) and other auxiliary equipments, which are expected to be delivered and installed by October 2013.

The Guangdong section of the Xiamen-Shenzhen line will start at the border between Fujian and Guangdong provinces, and travel to Shenzhen city via Chaozhou-Shantou region, Shanwei, Huizhou city and other cities. Once work on the section is completed, the full 502 km journey from Xiamen city to Shenzhen city will take three hours. It is believed that this line is of utmost importance to the local economy, because it brings three important special economic zones, Xiamen, Shantou, and Shenzhen together in a much more convenient, economic and faster way.

Dr Changli Wang, chairman and CEO of Hollysys, commented: "We are pleased to win this contract to supply the ground-based signaling equipments for the Guangdong section of the Xiamen-Shenzhen line. We believe that with our strong research and development and implementation capability and excellent track record, Hollysys will continue to benefit from China's restarted high-speed rail construction and create value for our shareholders”.

For more information on companies in this article

Related Content

  • Grant to fund commercialisation of PbC batteries for micro-hybrid vehicles
    May 25, 2012
    Axion Power International, the developer of advanced lead-¬carbon PbC batteries and energy storage systems, has been awarded a US$150,000 grant from the US Department of Energy (DoE) to fund a commercialisation plan for the use of its PbC batteries in a low-cost, high-efficiency dual battery architecture for micro-hybrid vehicles.
  • Enforcement comes in many guises
    June 22, 2016
    Colin Sowman looks at some enforcement case studies from around the world. It is a sad fact of life that unenforced laws are not adhered to by a sometimes sizable proportion of the public and once enforcement is seen to be lacking, some drivers can take this to extremes and authorities must decide how to regain control.
  • When speed compliance becomes a safety issue
    March 29, 2017
    David Crawford finds that softly, softly can be safely, safely when it comes to speed enforcement. Comedians and controversial TV presenters have long made jokes about having to watch the speedometer so closely as they pass speed camera after speed camera that they mow down bus queues. But the joke may have some factual basis according to a study by researchers from the University of Western Australia.
  • Glasgow’s new Operations Centre has a key role in city’s future
    June 6, 2014
    David Crawford investigates a control centre with a future. Destined to play a central role in keeping the city and its transport running smoothly during the 2014 Commonwealth Games in July, the new Glasgow Operations Centre in Scotland’s largest urban centre formally went live earlier this year. The aim was to dry run its far-reaching integration of previously distinct core systems and familiarise the public with the initial phase of what will be a long-term post-event legacy. The centre brings together, i