Skip to main content

Haifa Metronit BRT system set to kick off

The long-awaited overhaul to the Haifa metropolitan area’s public transportation system begins to take shape this week, as a portion of the extensive Metronit bus rapid transit (BRT) project starts to hit the roads throughout the region. Making use of approximately 40 kilometres of exclusive BRT lanes, the low-to-the-ground and high capacity Metronit aims for efficiency and convenience with its 84 efficient diesel and six hybrid vehicles, according to the Transportation Ministry. The first buses will appear
July 22, 2013 Read time: 2 mins
The long-awaited overhaul to the Haifa metropolitan area’s public transportation system begins to take shape this week, as a portion of the extensive Metronit bus rapid transit (BRT) project starts to hit the roads throughout the region.

Making use of approximately 40 kilometres of exclusive BRT lanes, the low-to-the-ground and high capacity Metronit aims for efficiency and convenience with its 84 efficient diesel and six hybrid vehicles, according to the Transportation Ministry.

The first buses will appear on Haifa’s transportation routes on 26 July; all 90 buses, together with 143 new platforms, upgraded above-ground and underground infrastructure and electronic ticketing systems will be in operation by early August.

“The Haifa metropolitan region is continuously evolving and the launch of the Metronit is an important part of the city’s development,” said Haifa Mayor Yona Yahav. “The municipalities were full partners in the Metronit project and in improving the entire public transportation system in the region. We will continue to work toward improving resident services and public transportation, which is an important component of such service.”

Related Content

  • July 31, 2012
    Dubai metro - the world's longest automated rail system
    David Crawford reviews the recent opening of Dubai's Red Line. The US$7.6bn Dubai Metro, the Phase I Red Line of which started partial operation in September 2009, will be the world's longest driverless rail system on its planned completion in 2011. With a total length of some 75km, it will then overtake the 68.7km Vancouver SkyTrain and be able to carry over 1.2 million passengers on a typical day.
  • October 22, 2014
    Smoothing the path to reducing traffic pollution
    David Crawford reviews a new approach to traffic smoothing. A key objective for the Californian city of Bakersfield’s upgraded traffic operations centre (TOC), which opened in June 2014, is to help improve living conditions in a region with one of the worst air quality problems in the US. The TOC is speeding up the smoothing of traffic flows by delivering faster and better-informed traffic signal retiming and synchronisation.
  • October 7, 2022
    Rekor AI speeds Ohio transit
    New web platform designed to help reduce journey times and improve road safety
  • August 29, 2012
    Integrated corridor management 'to enhance travel efficiency'
    New systems of software are coming together to form the technological backbone of a project that will apply practically to one corridor in Dallas, but influence travel across a wider area. Dallas Area Rapid Transit (DART) is the lead agency for an extensive Integrated Corridor Management (ICM) project in Dallas, covering an area stretching north east of downtown Dallas, 20 miles long by two miles wide. The corridor is defined loosely by the US-75 freeway and DART’s light rail ‘red line’. These are the theor