Skip to main content

Guide on how to improve bike network connectivity with modest changes

The Mineta Transportation Institute has released a peer-reviewed research report, Low-Stress Bicycling and Network Connectivity. As part of its work, the research team created measures of low-stress bicycle route connectivity that can be used to evaluate and guide bicycle network planning. As a result, the team proposed a set of criteria by which road segments can be classified into four levels of traffic stress (LTS). The report includes a sample case study in which every street in San Jose, California, is
June 1, 2012 Read time: 3 mins
RSSThe 5277 Mineta Transportation Institute has released a peer-reviewed research report, Low-Stress Bicycling and Network Connectivity. As part of its work, the research team created measures of low-stress bicycle route connectivity that can be used to evaluate and guide bicycle network planning. As a result, the team proposed a set of criteria by which road segments can be classified into four levels of traffic stress (LTS). The report includes a sample case study in which every street in San Jose, California, is classified by LTS.

"For a bicycling network to attract the widest possible segment of the population, its most fundamental attribute should be low-stress connectivity," said Maaza C. Mekuria, one of the authors of the report. "In other words, we should be providing routes between people's origins and destinations that do not require cyclists to use links that exceed their tolerance for traffic stress, and that do not involve an undue number of detours. So we proposed and tested the practicality of a new way to define the bicycle network as the set of streets and paths that people consider acceptably safe for bicycling."

To fulfil a second goal, the researchers developed metrics for low-stress connectivity, or the ability of a network to connect travellers' origins to their destinations without subjecting them to unacceptably stressful links.

To make bicycling safer and more appealing, cities often make bicycle-related improvements to certain streets. However, those improvements do not necessarily represent the network of paths and streets that people deem safe enough to use. The LTS criteria can distinguish four levels of a street network's stressfulness, corresponding to identified user profiles, and they offer cities a way of mapping their bicycling networks according to which populations they serve rather than according to facility types. The research also highlights the importance of intersection approaches and street crossings in network connectivity.

The report includes several new analysis tools for visualizing connectivity, including stress maps, shortest-path trees, and maps highlighting barriers and islands. Illustrations and figures include examples of bike lanes, various stress maps, sample connectivity graphs, and more. Tables include levels of traffic stress for various configurations, distribution of centre-line miles by level of traffic stress, proposed improvements, and more.

The free 68-page report is available for download here.

For more information on companies in this article

Related Content

  • Big data bonus for Dublin’s buses
    August 19, 2014
    Dublin’s smart research partnership speeds buses More than 50% of people travelling into and across the Irish capital rely on public transport, and four out of 10 these use buses meaning Dublin Bus carries some 120 million passengers a year.
  • TM 2.0 boost TMC data feed and driver influence
    November 15, 2017
    TM 2.0 views connected vehicles and V2I as two-way communications channels, benefitting traffic management and drivers, as Alan Dron discovers. As connected vehicles are progressively rolled out there will come a point at which traffic managers and traffic management centres (TMCs) will have to gear up to cope with a rapidly-evolving road scenario. The TM 2.0 Platform (see box) is promoting a concept of new-generation traffic management (which carries the same TM 2.0 title) and is studying how future T
  • TomTom provides flexibility for Riyadh
    June 1, 2016
    With five years of traffic disruption ahead and an inadequate traffic monitoring system, the authorities in Riyadh needed a solution – and quickly. In preparation for embarking on what is currently the world’s largest metro construction project, the Arriyadh Development Authority (ADA) in Riyadh needed to put in place measures to minimise the additional congestion and travel delays the five-year project would inevitably cause.
  • Do we need a new approach to ITS and traffic management?
    January 31, 2012
    In an article which has implications for the European Electronic Toll Service, ASECAP's Kallistratos Dionelis asks whether the approach we currently take to major ITS system implementations is always the best or healthiest. I was asked recently to write a paper on the technology-oriented future of transport. To paraphrase, I started with: "The goal of European policy-makers is to establish a transport system which meets society's economic, social and environmental needs, satisfying in parallel a rising dema