Skip to main content

Guide on how to improve bike network connectivity with modest changes

The Mineta Transportation Institute has released a peer-reviewed research report, Low-Stress Bicycling and Network Connectivity. As part of its work, the research team created measures of low-stress bicycle route connectivity that can be used to evaluate and guide bicycle network planning. As a result, the team proposed a set of criteria by which road segments can be classified into four levels of traffic stress (LTS). The report includes a sample case study in which every street in San Jose, California, is
June 1, 2012 Read time: 3 mins
RSSThe 5277 Mineta Transportation Institute has released a peer-reviewed research report, Low-Stress Bicycling and Network Connectivity. As part of its work, the research team created measures of low-stress bicycle route connectivity that can be used to evaluate and guide bicycle network planning. As a result, the team proposed a set of criteria by which road segments can be classified into four levels of traffic stress (LTS). The report includes a sample case study in which every street in San Jose, California, is classified by LTS.

"For a bicycling network to attract the widest possible segment of the population, its most fundamental attribute should be low-stress connectivity," said Maaza C. Mekuria, one of the authors of the report. "In other words, we should be providing routes between people's origins and destinations that do not require cyclists to use links that exceed their tolerance for traffic stress, and that do not involve an undue number of detours. So we proposed and tested the practicality of a new way to define the bicycle network as the set of streets and paths that people consider acceptably safe for bicycling."

To fulfil a second goal, the researchers developed metrics for low-stress connectivity, or the ability of a network to connect travellers' origins to their destinations without subjecting them to unacceptably stressful links.

To make bicycling safer and more appealing, cities often make bicycle-related improvements to certain streets. However, those improvements do not necessarily represent the network of paths and streets that people deem safe enough to use. The LTS criteria can distinguish four levels of a street network's stressfulness, corresponding to identified user profiles, and they offer cities a way of mapping their bicycling networks according to which populations they serve rather than according to facility types. The research also highlights the importance of intersection approaches and street crossings in network connectivity.

The report includes several new analysis tools for visualizing connectivity, including stress maps, shortest-path trees, and maps highlighting barriers and islands. Illustrations and figures include examples of bike lanes, various stress maps, sample connectivity graphs, and more. Tables include levels of traffic stress for various configurations, distribution of centre-line miles by level of traffic stress, proposed improvements, and more.

The free 68-page report is available for download here.

For more information on companies in this article

Related Content

  • Google live traffic announced for 13 European countries
    April 19, 2012
    Google has announced that it is making road traffic conditions available in 13 countries in Europe. The new traffic information is in the traffic layer on Google Maps, Google Maps for mobile, and Google Maps Navigation (Beta). Coverage includes all freeways and highways, as well as large roads in major cities in Austria, Belgium, Czech Republic, Denmark, Germany, Ireland, Israel, Luxembourg, Netherlands, Poland, Slovakia, Spain and Switzerland. Users in the UK will also benefit from a finer grain of street
  • Professional training key to the future of ITS
    May 21, 2012
    A substantial portfolio of resources is available and expanding, to help employers and professionals build essential skills for current and future needs – the ITS Professional Capacity Building Program. Pete Goldin reports. The US Department of Transportation (USDOT) views ITS as key to the future of transportation, as is evident from the department’s ITS Professional Capacity Building (PCB) program. This is a further manifestation of USDOT’s commitment to ITS. The PCB program provides anyone in the transpo
  • Slow moving US road user charging programme
    July 18, 2012
    Bern Grush recently attended the Mileage-Based User Fee Conference in Austin Texas where the fledgling American landscape for Road User Charging is beginning to take shape. When I was a kid I liked to poke sticks into the ants' nests in sidewalk cracks. Ants would scatter in every conceivable direction. They ran in circles, they ran over and through each other. They screamed without logic. I was fascinated.
  • US to stage two-day summit on traffic incident management
    June 14, 2012
    The US Federal Highway Administration (FHWA) will host a two-day summit on 26-27 June on advancing the culture of traffic incident management (TIM) throughout the country. US Department of Transportation (USDoT) Secretary Raymond LaHood and Federal Highway Administrator Victor Mendez will welcome the group and provide opening remarks demonstrating the commitment of FHWA and USDoT senior executives in support of safe, quick traffic incident responses on the nation's roadways. Those attending this summit incl