Skip to main content

Green light for Houston light rail project

Granite Construction has announced that the Houston Rapid Transit Joint Venture team (HRT) has received full notice to proceed on the US$1.2 billion contract to expand the existing light rail transit system in Houston, Texas. The design/build contract was awarded to HRT in 2009 by the Metropolitan Transit Authority of Harris County, Texas.
April 17, 2012 Read time: 1 min
RSSGranite Construction has announced that the Houston Rapid Transit Joint Venture team (HRT) has received full notice to proceed on the US$1.2 billion contract to expand the existing light rail transit system in Houston, Texas. The design/build contract was awarded to HRT in 2009 by the Metropolitan Transit Authority of Harris County, Texas.

Led by 4089 Parsons Transportation Group, HRT includes Granite Construction, Kiewit Texas Construction, and Stacy and Witbeck. The team is responsible for expanding the existing light rail transit system in three new corridors in downtown Houston totalling an additional 24 kms of light rail transit. Scope of the work includes 24 stations, storage and inspection facilities and a major renovation to the existing rail operations centre.

The project is scheduled to be completed in 2014.

For more information on companies in this article

Related Content

  • Gearing up for IntelliDrive cooperative traffic management
    February 1, 2012
    Beginning in the first quarter of 2010 it became evident that the IntelliDrivesm programme direction had been reestablished, by the USDOT's ITS Joint Program Office (JPO), after being adrift for a few years. The programme was now moving toward a deployment future and with a much broader stakeholder involvement than it had exhibited previously. By today not only is it evident that the programme was reestablished with a renewed emphasis on deployment, it is also apparent that it is moving along at a faster pa
  • Parsons wins Engineering Excellence Grand Award
    February 14, 2017
    US engineering services firm Parsons has received the 2017 Grand Award in the transportation category from the American Council of Engineering Companies of Missouri for the Columbia I 70 Bridges design build project. Parsons was the lead designer for this US$18 million project for the Missouri Department of Transportation, which involved replacing six deficient bridges with five new weathering steel plate girder bridges while accommodating 80,000+ vehicles per day on the road. Built in 1957, the existing
  • Telvent to enhance ATMS and ITS system in Florida
    May 31, 2012
    Telvent GIT has announced that it will provide continuous engineering and IT services to upgrade and enhance Pinellas County’s advanced traffic management system (ATMS) and ITS. Since becoming operational in 2006, the county’s ATMS has reduced the number of stops and delays and improved overall travel times. Additionally, Pinellas County has realised an improvement in air quality. Telvent, which has worked with the county since 2003, will upgrade and enhance the ATMS and ITS systems with its advanced techno
  • Atlanta’s reversible express lanes project opens
    January 27, 2017
    The I-75 South Metro reversible express lane project In Atlanta, Georgia, US, will open this weekend along almost 21km between Highway 138 and Highway 155 on the new double-lane addition to the I-75 median. The lanes will carry traffic northbound toward downtown Atlanta during the morning rush hour and southbound during midday and peak afternoon and evening traffic. Parsons prepared conceptual design reports for the project, including lane configuration and access studies, as well as the environmental