Skip to main content

Green light for Houston light rail project

Granite Construction has announced that the Houston Rapid Transit Joint Venture team (HRT) has received full notice to proceed on the US$1.2 billion contract to expand the existing light rail transit system in Houston, Texas. The design/build contract was awarded to HRT in 2009 by the Metropolitan Transit Authority of Harris County, Texas.
April 17, 2012 Read time: 1 min
RSSGranite Construction has announced that the Houston Rapid Transit Joint Venture team (HRT) has received full notice to proceed on the US$1.2 billion contract to expand the existing light rail transit system in Houston, Texas. The design/build contract was awarded to HRT in 2009 by the Metropolitan Transit Authority of Harris County, Texas.

Led by 4089 Parsons Transportation Group, HRT includes Granite Construction, Kiewit Texas Construction, and Stacy and Witbeck. The team is responsible for expanding the existing light rail transit system in three new corridors in downtown Houston totalling an additional 24 kms of light rail transit. Scope of the work includes 24 stations, storage and inspection facilities and a major renovation to the existing rail operations centre.

The project is scheduled to be completed in 2014.

Related Content

  • New era of MAX transport for Perth
    August 19, 2013
    A joint venture of Parsons Brinckerhoff and Aecom has been selected by Western Australia’s Department of Transport (DoT) to form an integrated services team for the next phase of the 22 km Metro Area Express (MAX) light rail network. The JV is working with the DoT to develop a robust business case for the US$1.8 billion project that will change the face of Perth’s transport network. MAX project director for the DoT, David Thomas, said the project will introduce a new era of public transport to Perth. “MAX w
  • Denver light rail contract awarded
    July 31, 2015
    Denver’s Regional Transportation District (RTD) Board of Directors has approved a US$140 million two-phased contract award to Balfour Beatty Infrastructure (BBII) to design and build the Southeast Rail Extension. Design will begin during the fall with construction expected to start in spring 2016. The Southeast Rail Extension will build an additional 2.3 miles of light rail on the existing Southeast Rail Line south of Lincoln. When complete it will include an end-of-line station at RidgeGate Parkway,
  • Aecon consortium selected for Eglinton Crosstown light rail transit project
    June 11, 2015
    Crosslinx Transit Solutions, consisting of Aecon, ACS Infrastructure Canada, EllisDon, and SNC-Lavalin, has been selected by Metrolinx and Infrastructure Ontario as the preferred supplier for the development of the Eglinton Crosstown light rail transit project in Toronto.
  • Bombardier and Lilee Systems team up on New York MTA positive train control
    May 9, 2014
    Bombardier Transportation has selected Lilee Systems to design and deploy the communications systems for the New York Metropolitan Transportation Authority’s (NYMTA) positive train control (PTC).