Skip to main content

Gotthard Base Tunnel opens in Switzerland

After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour. The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will al
June 1, 2016 Read time: 2 mins
After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour.

The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will all attend the celebrations to inaugurate tunnel.

The tunnel, which cost US$12 billion (€11 billion) to complete, is at the heart of the New Trans-Alpine Railway Link project, geared towards improving the north-south rail link through the Alps.

Base tunnels enable flatter and shorter rail routes so trains can travel at higher speeds and pull more weight. The link is only 550 metres above sea level at its highest point - much lower than existing routes through the Alps, says swissinfo.ch

189 Siemens has supplied the tunnel control and fire protection systems for the tunnel; the sophisticated safety system has over 200,000 sensors, while the control system controls and automatically monitors all installations, including train movements, train door status, tunnel lighting and ventilation. The tunnel is fitted with sensors, control electronics and surveillance equipment, including video cameras.

The tunnel tubes are connected every 300 metres by crosscuts that allow train passengers to escape to the other tube in case of a fire. Each tube has two emergency-stop stations 600 meters in length which allows the evacuation of up to 1,000 passengers.

For more information on companies in this article

Related Content

  • Government sets out blueprint for Northern Powerhouse
    August 14, 2015
    The UK’s Department for Transport (DfT) has set out the blueprint for how US$20 billion of government investment in transport will help create the Northern Powerhouse. The investment aims to make transport better by improving the links, bringing cities closer together and strengthening connections. The blueprint shows how transport links across the north are being transformed by government investment. Transport secretary Patrick McLoughlin said: “This one nation government is determined to close the e
  • Peru prequalifies three consortiums for Lima metro line 2
    February 7, 2014
    Peru's private investment promotion agency ProInversión has prequalified three consortiums for the US$5.70 billion construction, operation and maintenance of line 2 of Lima's metro. Technical and economic offers are still due by 21 February, with ProInversión aiming to award the tender for the 35-year concession on 28 February. The consortiums are: Consorcio Nuevo Metro de Lima, comprised of Spain's ACS and FCC, Italian companies Impregilo and AnsaldoBreda and Peru's Cosapi; Consorcio Metro Subterráneo
  • Vision 2016 highlights the latest trends and technology in machine vision
    October 28, 2016
    The Vision Show is the perfect venue to catch up with the latest moves, trends and launches in the traffic vision sector, and ITS International editor Colin Sowman highlights a few to start with…
  • The cost benefits of LED traffic signals
    July 16, 2012
    On 11 January 2005, the Kentucky Transportation Cabinet (KYTC) began installing GELcore LED traffic signal modules state-wide through an Energy Savings Performance Contract. In tendering for the work, the energy service contractors could choose any manufacturers equipment but all of them proposed to use the GELcore brand.