Skip to main content

Gotthard Base Tunnel opens in Switzerland

After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour. The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will al
June 1, 2016 Read time: 2 mins
After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour.

The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will all attend the celebrations to inaugurate tunnel.

The tunnel, which cost US$12 billion (€11 billion) to complete, is at the heart of the New Trans-Alpine Railway Link project, geared towards improving the north-south rail link through the Alps.

Base tunnels enable flatter and shorter rail routes so trains can travel at higher speeds and pull more weight. The link is only 550 metres above sea level at its highest point - much lower than existing routes through the Alps, says swissinfo.ch

189 Siemens has supplied the tunnel control and fire protection systems for the tunnel; the sophisticated safety system has over 200,000 sensors, while the control system controls and automatically monitors all installations, including train movements, train door status, tunnel lighting and ventilation. The tunnel is fitted with sensors, control electronics and surveillance equipment, including video cameras.

The tunnel tubes are connected every 300 metres by crosscuts that allow train passengers to escape to the other tube in case of a fire. Each tube has two emergency-stop stations 600 meters in length which allows the evacuation of up to 1,000 passengers.

For more information on companies in this article

Related Content

  • First electric car ferry goes into operation in Norway
    May 19, 2015
    The world’s first electrical car and passenger ferry powered by batteries has entered service in Norway. The unique solution is a result of a competition that Ministry of Transport and Communications and the Norwegian Public Roads Administration launched in 2010. The ferry only uses 150 kWh per route, which corresponds to three days use of electricity in a standard Norwegian household. Built in conjunction with shipbuilder Fjellstrand, Siemens installed the complete electric propulsion system and install
  • Melbourne welcomes the world in opening spectacular
    October 10, 2016
    Through the melodic rhythm of the didgeridoo and traditional dancing, the 2016 ITS World Congress opening ceremony reflected the 2,500 generations that indigenous people have lived in Australia while the speakers considered the challenges facing host city Melbourne, other urban areas around Australia
  • The long road to Spanish enlightenment
    October 22, 2018
    Julián Núñez, immediate past president of ASECAP, gets his teeth into the vision of a European strategy for toll roads. David Arminas reports from Madrid. Getting European politicians to agree to a long-term cross-border highway infrastructure programme for toll roads is extremely difficult. It’s a bit like pulling teeth: people want to avoid the pain. But pain is something that Spanish operators, including Abertis, OHL, ACS, FCC and Acciona, have been going through for the past decade. The country has
  • High-speed AVs investigated in Milton Keynes
    February 14, 2023
    English city has received £200,000 from UK government to look at mass transit concept