Skip to main content

Gotthard Base Tunnel opens in Switzerland

After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour. The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will al
June 1, 2016 Read time: 2 mins
After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour.

The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will all attend the celebrations to inaugurate tunnel.

The tunnel, which cost US$12 billion (€11 billion) to complete, is at the heart of the New Trans-Alpine Railway Link project, geared towards improving the north-south rail link through the Alps.

Base tunnels enable flatter and shorter rail routes so trains can travel at higher speeds and pull more weight. The link is only 550 metres above sea level at its highest point - much lower than existing routes through the Alps, says swissinfo.ch

189 Siemens has supplied the tunnel control and fire protection systems for the tunnel; the sophisticated safety system has over 200,000 sensors, while the control system controls and automatically monitors all installations, including train movements, train door status, tunnel lighting and ventilation. The tunnel is fitted with sensors, control electronics and surveillance equipment, including video cameras.

The tunnel tubes are connected every 300 metres by crosscuts that allow train passengers to escape to the other tube in case of a fire. Each tube has two emergency-stop stations 600 meters in length which allows the evacuation of up to 1,000 passengers.

Related Content

  • Siemens wins order from DB Regio for 57 regional trains
    August 16, 2017
    DB Regio in Germany has ordered 57 three-car Mireo train sets from Siemens, the company’s new regional and commuter train platform. The trains will begin service on routes in the states of Baden-Württemberg and southern Hesse in December 2020 and on the Mannheim-Mainz route in December 2021. The Mireo is designed as a scalable articulated train, while its new aerodynamic design and quiet bogies reduce noise. Siemens says the train's lightweight construction, energy-efficient components and intelligent bo
  • Musk Loop to make June Vegas debut
    April 30, 2021
    'Teslas in tunnels' initiative will be ready for Las Vegas Convention Center visitors in June
  • Imperatives to shape extended mobility ecosystems of tomorrow
    April 10, 2014
    New survey shows cities ill prepared to meet the increasing demand for urban mobility. Most of the world’s cities are ill-equipped to cope with the predicted increase in demands on urban travel – that is the stark finding of the second ‘Future of Urban Mobility’ study carried out by global management consultancy Arthur D. Little. Compiled in association with the International Association of Public Transport (UITP), the survey examines and rates urban mobility in 84 cities worldwide against an extended set o
  • Conduent brings contactless payments to Italy
    August 11, 2021
    Conduent says ticket is not stored on a device or other media, but in the cloud