Skip to main content

Gotthard Base Tunnel opens in Switzerland

After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour. The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will al
June 1, 2016 Read time: 2 mins
After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour.

The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will all attend the celebrations to inaugurate tunnel.

The tunnel, which cost US$12 billion (€11 billion) to complete, is at the heart of the New Trans-Alpine Railway Link project, geared towards improving the north-south rail link through the Alps.

Base tunnels enable flatter and shorter rail routes so trains can travel at higher speeds and pull more weight. The link is only 550 metres above sea level at its highest point - much lower than existing routes through the Alps, says swissinfo.ch

189 Siemens has supplied the tunnel control and fire protection systems for the tunnel; the sophisticated safety system has over 200,000 sensors, while the control system controls and automatically monitors all installations, including train movements, train door status, tunnel lighting and ventilation. The tunnel is fitted with sensors, control electronics and surveillance equipment, including video cameras.

The tunnel tubes are connected every 300 metres by crosscuts that allow train passengers to escape to the other tube in case of a fire. Each tube has two emergency-stop stations 600 meters in length which allows the evacuation of up to 1,000 passengers.

Related Content

  • Bon voyage from Flowbird as Clermont-Ferrand opens up
    March 20, 2023
    Open payment system in French university city has attracted 100,000 transactions so far
  • Success of London's Olympic public transport systems
    December 4, 2012
    The Olympic flame has moved on, allowing review of the relative degrees of London’s 2012 transportation success, how it was done and with what lasting effects. Jon Masters reports. This magazine’s international position provides a good vantage point for assessing impressions left by London’s 2012 Olympic Games. On the whole, it has been only praise and congratulations heard since the closing ceremonies of the Olympic Games in August and the Paralympics in September. The events looked great and ran smoothly
  • EU offers $82 million for greener freight transport
    June 25, 2012
    The European Commission's (EC's) second Marco Polo funding programme for projects which shift freight transport from the road to sea, rail and inland waterways, has launched a call for proposals to reduce road congestion and also the impact of freight transportation upon the environment. The call for proposals is worth US$82 million. Companies who are able to transfer their freight from the roads, and use alternative transportation methods such as by sea, rail and inland waterways will receive grants under
  • FCC consortium to build Colombia tunnel project
    November 2, 2015
    A consortium led by Spanish company FCC has been awarded a contract for the Toyo tunnel project, including design, construction, operation and maintenance of the tunnel in the Urabá Port, around 80 kilometres from Medellín, Colombia. The US$432 million project, which is expected to take ten years to complete, is located between the municipalities of Giraldo and Cañasgordas, around 500 kilometres north-west of Bogotá. It includes the building of a completely new road section, 41 kilometres long with one