Skip to main content

Gotthard Base Tunnel opens in Switzerland

After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour. The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will al
June 1, 2016 Read time: 2 mins
After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour.

The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will all attend the celebrations to inaugurate tunnel.

The tunnel, which cost US$12 billion (€11 billion) to complete, is at the heart of the New Trans-Alpine Railway Link project, geared towards improving the north-south rail link through the Alps.

Base tunnels enable flatter and shorter rail routes so trains can travel at higher speeds and pull more weight. The link is only 550 metres above sea level at its highest point - much lower than existing routes through the Alps, says swissinfo.ch

189 Siemens has supplied the tunnel control and fire protection systems for the tunnel; the sophisticated safety system has over 200,000 sensors, while the control system controls and automatically monitors all installations, including train movements, train door status, tunnel lighting and ventilation. The tunnel is fitted with sensors, control electronics and surveillance equipment, including video cameras.

The tunnel tubes are connected every 300 metres by crosscuts that allow train passengers to escape to the other tube in case of a fire. Each tube has two emergency-stop stations 600 meters in length which allows the evacuation of up to 1,000 passengers.

Related Content

  • Flexible, demand-based parking charges ease parking problems
    April 10, 2012
    Innovative parking initiatives on the US Pacific Coast. David Crawford reviews. Californian cities are leading the way in trialling new solutions to their endemic parking problems. According to Donald Shoup, a professor of urban planning at the University of California in Los Angeles, drivers looking for available spots can cause up to 74% of traffic congestion in downtown areas. One solution is variable, demand-responsive pricing of parking.
  • Oxfordshire uses Siemens’ traffic weight enforcement system to protect bridge
    November 30, 2017
    Siemens’ Automatic Number Plate Recognition cameras have been deployed to enforce weight restrictions on one of the oldest river crossings on the River Thames at Newbridge, UK. The new traffic enforcement system has been introduced by Trading Standards in Oxfordshire whose officers will monitor the bridge and enforce the limit. Vehicles exceeding 18 tonnes maximum gross weight can be fined up to £1000 ($1,300).
  • Priority boosts ridership and cuts congestion
    May 4, 2016
    Transit priority is proving a win-win in Europe and Australia. David Crawford reports. Technology that integrates with the Australian-originated Sydney Coordinated Adaptive Traffic System (SCATS) is driving bus signal priority and performance analysis initiatives on both sides of the world; in its homeland, with a major deployment in 2015, and in the capital of the Republic of Ireland.
  • Receiving real time passenger information in Finland
    February 3, 2012
    David Crawford sees lively prospects for Finnish innovation