Skip to main content

Gotthard Base Tunnel opens in Switzerland

After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour. The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will al
June 1, 2016 Read time: 2 mins
After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour.

The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will all attend the celebrations to inaugurate tunnel.

The tunnel, which cost US$12 billion (€11 billion) to complete, is at the heart of the New Trans-Alpine Railway Link project, geared towards improving the north-south rail link through the Alps.

Base tunnels enable flatter and shorter rail routes so trains can travel at higher speeds and pull more weight. The link is only 550 metres above sea level at its highest point - much lower than existing routes through the Alps, says swissinfo.ch

189 Siemens has supplied the tunnel control and fire protection systems for the tunnel; the sophisticated safety system has over 200,000 sensors, while the control system controls and automatically monitors all installations, including train movements, train door status, tunnel lighting and ventilation. The tunnel is fitted with sensors, control electronics and surveillance equipment, including video cameras.

The tunnel tubes are connected every 300 metres by crosscuts that allow train passengers to escape to the other tube in case of a fire. Each tube has two emergency-stop stations 600 meters in length which allows the evacuation of up to 1,000 passengers.

Related Content

  • April 27, 2016
    Joint venture to develop advanced public transport systems for UAE
    RATP Dev, the international subsidiary of French state-owned public transport operator RATP Group, and Zain Capital, part of the Lakhraim Business Group, have established a new joint venture in the UAE to provide advanced public transportation solutions. RATP Dev Transportation will be based in Abu Dhabi. In June 2015, RATP Dev signed a partnership with Lakhraim Business Group to set up a joint venture targeting the leading transport projects in the UAE. RATP Dev is currently working on large-scale projects
  • April 17, 2012
    Germany eyes national car tolls
    Germany's conservative CSU party has said that it will issue a draft bill on a new road toll for cars in autumn 2011. It says that even if car taxes were lowered, extending the national tolling system from trucks to cars, would raise billions of euros over the next few years. However, Chancellor Angela Merkel is on record as saying that no tolls for cars will be introduced during the current legislative period.
  • October 13, 2020
    Bombardier delivers Bangkok monorails
    Manufacturer also developing APM system for Thailand's driverless mass transit system 
  • September 5, 2013
    Thales scoops Hong Kong signalling contract
    Thales has been awarded a contract by Hong Kong’s metro operator, MTR Corporation, to provide signalling technology for Shatin to Central Link Phase 1 segment of the Hong Kong metro using a communications-based train control (CBTC) system. To provide fully automatic train operation the contract includes the modernisation of the Ma On Shan Line and West Rail Line lines, where Thales previously installed its CBTC solution in 2003/04.