Skip to main content

Gotthard Base Tunnel opens in Switzerland

After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour. The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will al
June 1, 2016 Read time: 2 mins
After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour.

The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will all attend the celebrations to inaugurate tunnel.

The tunnel, which cost US$12 billion (€11 billion) to complete, is at the heart of the New Trans-Alpine Railway Link project, geared towards improving the north-south rail link through the Alps.

Base tunnels enable flatter and shorter rail routes so trains can travel at higher speeds and pull more weight. The link is only 550 metres above sea level at its highest point - much lower than existing routes through the Alps, says swissinfo.ch

189 Siemens has supplied the tunnel control and fire protection systems for the tunnel; the sophisticated safety system has over 200,000 sensors, while the control system controls and automatically monitors all installations, including train movements, train door status, tunnel lighting and ventilation. The tunnel is fitted with sensors, control electronics and surveillance equipment, including video cameras.

The tunnel tubes are connected every 300 metres by crosscuts that allow train passengers to escape to the other tube in case of a fire. Each tube has two emergency-stop stations 600 meters in length which allows the evacuation of up to 1,000 passengers.

Related Content

  • April 28, 2014
    Jakarta plans integrated tunnels for traffic and floodwater
    Jakarta’s city administration is to begin work on building two dual-purpose tunnels by the end of the year in an effort to address increasingly dire conditions on the capital’s gridlocked, flood-prone streets.
  • August 1, 2013
    Milestone for Opal smart cards in Sydney
    Public transport passengers in Sydney, Australia, have enthusiastically welcomed the city’s new Opal smart card, being progressively rolled out across ferries, trains, buses and light rail in the greater Sydney area, with 10,000 already issued since trials began in December 2012. By 2015 the Opal system, being installed by the Cubic-led Pearl Consortium for Transport New South Wales, will cover 42 ferry wharves, more than 300 train stations and more than 5,000 buses and light rail systems.
  • October 16, 2014
    Irish tunnel contracts awarded to Egis
    Ireland’s National Roads Authority (NRA) has awarded Egis the renewal and extension of the operation and maintenance contract of the Dublin Tunnel for a period of six years, with a possible four-year extension. This new contract follows a first operation and maintenance contract awarded to the Group in February 2006 and includes the toll collection, traffic and safety management and routine maintenance, including winter and equipment maintenance. It also includes the operation and maintenance of the
  • November 12, 2014
    Flir expands Marseille’s tunnel vision
    Marseille’s city authority has added the monitoring of a second tunnel to the existing network with a new approach towards video management. Measuring 1.5km in length, the double-deck Prado Sud tunnel extends Marseille’s existing 2.5km Prado Carénage tunnel towards the southern part of the city. While it was logical to use a common control room and to use the latest detection and monitoring systems in the new tunnel, it was deemed too disruptive and costly to completely upgrade the existing tunnel.