Skip to main content

Gotthard Base Tunnel opens in Switzerland

After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour. The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will al
June 1, 2016 Read time: 2 mins
After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour.

The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will all attend the celebrations to inaugurate tunnel.

The tunnel, which cost US$12 billion (€11 billion) to complete, is at the heart of the New Trans-Alpine Railway Link project, geared towards improving the north-south rail link through the Alps.

Base tunnels enable flatter and shorter rail routes so trains can travel at higher speeds and pull more weight. The link is only 550 metres above sea level at its highest point - much lower than existing routes through the Alps, says swissinfo.ch

189 Siemens has supplied the tunnel control and fire protection systems for the tunnel; the sophisticated safety system has over 200,000 sensors, while the control system controls and automatically monitors all installations, including train movements, train door status, tunnel lighting and ventilation. The tunnel is fitted with sensors, control electronics and surveillance equipment, including video cameras.

The tunnel tubes are connected every 300 metres by crosscuts that allow train passengers to escape to the other tube in case of a fire. Each tube has two emergency-stop stations 600 meters in length which allows the evacuation of up to 1,000 passengers.

Related Content

  • December 15, 2017
    Indra deploys traffic monitoring system to improve mobility, Kuwait
    Indra has created a new traffic control centre in Kuwait equipped with its smart traffic and tunnel management platform, Horus, to present a graphic format of collected traffic data to operators and citizens. Analysis of the data is designed with the intention ascertaining commuter patterns or traffic growth, plan traffic infrastructures and develop new mobility laws and legislation.
  • November 4, 2014
    Apple’s arrival on payment scene is ‘tipping point’ in e-payments, says Verifone boss
    The new Apple Pay system will give a major boost to the contactless payment sector, industry experts believe. The benefits of such an influential name lending its weight to NFC devices are considerable, says June Yee Felix (right), president of Verifone Europe. “Apple Pay is something wonderful for our industry,”she told several hundred delegates attending the Opening Summit of CARTES SECURE CONNEXIONS 2014. “They have engaged the consumer.
  • March 12, 2018
    StreetLight Data reveals longest commutes to work across US
    Commuters in the US state of Maine travel 9.8 miles to work on a daily basis, a 72% longer journey than the 5.7-mile median commute in Wyoming, according to the latest report by StreetLight Data. The transportation analytics company conducted its study on nearly 30,000 ZIP codes in areas with over 1,000 residents as part of a strategy to help encourage businesses and governments to start fixing the accessibility gap. The inquiry also highlighted the longest and shortest commutes in each state by ZIP cod
  • April 17, 2012
    Toronoto activates next vehicle arrival system
    The Toronto Transit Commission in Canada has activated a next vehicle arrival system (NVAS) for its bus network and made available its open data/XML feed for third-party developers. Using GPS software, NVAS allows transit customers to receive real-time route data as to when the next buses (up to six succeeding) will arrive at any specific bus stop. Next-vehicle information is available for more than 9,300 TTC bus stops inside Toronto and more than 800 TTC bus stops in the GTA served by contracted TTC vehicl