Skip to main content

Gotthard Base Tunnel opens in Switzerland

After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour. The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will al
June 1, 2016 Read time: 2 mins
After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour.

The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will all attend the celebrations to inaugurate tunnel.

The tunnel, which cost US$12 billion (€11 billion) to complete, is at the heart of the New Trans-Alpine Railway Link project, geared towards improving the north-south rail link through the Alps.

Base tunnels enable flatter and shorter rail routes so trains can travel at higher speeds and pull more weight. The link is only 550 metres above sea level at its highest point - much lower than existing routes through the Alps, says swissinfo.ch

189 Siemens has supplied the tunnel control and fire protection systems for the tunnel; the sophisticated safety system has over 200,000 sensors, while the control system controls and automatically monitors all installations, including train movements, train door status, tunnel lighting and ventilation. The tunnel is fitted with sensors, control electronics and surveillance equipment, including video cameras.

The tunnel tubes are connected every 300 metres by crosscuts that allow train passengers to escape to the other tube in case of a fire. Each tube has two emergency-stop stations 600 meters in length which allows the evacuation of up to 1,000 passengers.

Related Content

  • November 8, 2016
    Driverless ParkShuttle to continue operations in the Netherlands
    2GetThere’s ParkShuttle driverless vehicle, which has been operated by Connexxion at the Rivium business park in Capelle aan den IJssel in the Netherlands since 1999, will continue running for at least two more years. The contract has been extended until 2018 by the Metropolitan Region Rotterdam The Hague (MRDH) and Capelle aan den IJssel plans to renew the system and expand it once the concession runs out.
  • October 2, 2014
    Mexico implements Indra traffic management technology
    Indra, in partnership with Auneti (Autopista Necaxa-Tihuatlán) and FCC, has deployed traffic management technology in the six tunnels of the new Necaxa-Tihuatlán highway in Mexico. The US$18 million project also includes intelligent transportation systems (ITS) and control and communication systems on the 83 kilometres of highway sections 1 and 2. A new operational control centre equipped with Indra's Horus integrated roadway and tunnel management solution manages traffic along the new road's two sectio
  • March 18, 2015
    Cost of northern Colombia rail line US$1 billion says study
    It would cost nearly US$1 billion to build a 260 kilometre rail line connecting cities in northern Colombia, according to a study by the Universidad del Norte in Barranquilla. The proposed rail corridor would link Santa Marta, Barranquilla and Cartagena, which are home to the three biggest ports on the country's Caribbean coast. The train would function as a mixed service line, transporting passengers as well as cargo. "Some details need to be worked out regarding funding sources, which depends more on the
  • January 3, 2013
    UK railways to benefit from information upgrade
    More than US$13.44 million funding will be spent by train companies to boost passenger information at stations across the UK. The funding will pay for a national roll-out to link customer information screens at stations to the latest live real time train information data, fed from a database developed and maintained by train companies. The upgrade will be rolled out in around 2,000 National Rail stations. The first stations will be switched on in summer 2014 and the whole project is anticipated to be comp