Skip to main content

Gotthard Base Tunnel opens in Switzerland

After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour. The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will al
June 1, 2016 Read time: 2 mins
After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour.

The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will all attend the celebrations to inaugurate tunnel.

The tunnel, which cost US$12 billion (€11 billion) to complete, is at the heart of the New Trans-Alpine Railway Link project, geared towards improving the north-south rail link through the Alps.

Base tunnels enable flatter and shorter rail routes so trains can travel at higher speeds and pull more weight. The link is only 550 metres above sea level at its highest point - much lower than existing routes through the Alps, says swissinfo.ch

189 Siemens has supplied the tunnel control and fire protection systems for the tunnel; the sophisticated safety system has over 200,000 sensors, while the control system controls and automatically monitors all installations, including train movements, train door status, tunnel lighting and ventilation. The tunnel is fitted with sensors, control electronics and surveillance equipment, including video cameras.

The tunnel tubes are connected every 300 metres by crosscuts that allow train passengers to escape to the other tube in case of a fire. Each tube has two emergency-stop stations 600 meters in length which allows the evacuation of up to 1,000 passengers.

Related Content

  • October 22, 2015
    Indra-Alstom to install tunnel security systems for Spanish high-speed rail link
    A consortium of Indra and Alstom España has won the contract to install public safety and security systems in the six tunnels on the high-speed rail link connecting Antequera and Granada in Spain. The contract also includes system maintenance for a period of 42 months. Over 100 km long, the rail link represents a key infrastructure in the development of the Andalusian Crossrail Project and forms part of the Trans-European Transport Network as one of the priority networks for improving passenger and cargo
  • August 19, 2016
    Trans-Pennine road tunnel routes shortlisted, may include special lighting, caverns
    Five routes have been shortlisted for the Trans-Pennine tunnel – the most ambitious road scheme undertaken in the UK in more than five decades. The Trans-Pennine tunnel study was launched by the government in autumn 2015, one of a number of studies aimed at addressing some of the biggest challenges facing the road network in the UK. The latest interim study shows the continued strong case for the tunnel which could provide safer, faster and more reliable journeys for motorists. All five routes join th
  • October 14, 2014
    Siemens extends first driverless metro line in Paris
    Siemens has received an order worth around US$57 million from Paris transit authority RATP (Régie Autonome des Transports Parisiens) to supply the train control equipment and operational control system for the extension of the driverless metro line 14 in Paris. Siemens will supply its Trainguard communication based train control (CBTC) type automatic train protection system, which enables driverless operation. Siemens equipped the original stretch of line 14 for automatic operation in 1998, establish
  • October 5, 2012
    Hong Kong’s rail terminus goes ahead
    With a total area of over 380,000 square meters, the multi-storey West Kowloon rail terminus, the majority of it located underground, will be larger than most airport terminals, and capable of handling around 99,000 passengers per day. The first trains are expected to run from 2015. The Hong Kong section of the express rail link, operating at up to 200 km per hour, will connect Hong Kong with the capital Beijing over 2,000 kilometers away, passing via Shenzhen, Guangzhou and Wuhan.