Skip to main content

Gotthard Base Tunnel opens in Switzerland

After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour. The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will al
June 1, 2016 Read time: 2 mins
After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour.

The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will all attend the celebrations to inaugurate tunnel.

The tunnel, which cost US$12 billion (€11 billion) to complete, is at the heart of the New Trans-Alpine Railway Link project, geared towards improving the north-south rail link through the Alps.

Base tunnels enable flatter and shorter rail routes so trains can travel at higher speeds and pull more weight. The link is only 550 metres above sea level at its highest point - much lower than existing routes through the Alps, says swissinfo.ch

189 Siemens has supplied the tunnel control and fire protection systems for the tunnel; the sophisticated safety system has over 200,000 sensors, while the control system controls and automatically monitors all installations, including train movements, train door status, tunnel lighting and ventilation. The tunnel is fitted with sensors, control electronics and surveillance equipment, including video cameras.

The tunnel tubes are connected every 300 metres by crosscuts that allow train passengers to escape to the other tube in case of a fire. Each tube has two emergency-stop stations 600 meters in length which allows the evacuation of up to 1,000 passengers.

Related Content

  • July 9, 2014
    New control room to ensure road safety
    The High Commission for the Development of Arriyadh (HCDA) in Riyadh, Saudi Arabia, has established a control and monitoring room as part of its road project to monitor all systems within the project and provide up to date status. The control room, which joins the extensions of Abu Bakr Al-Siddiq Road and Oruba Road across Riyadh airbase, includes advanced traffic management systems to monitor the city’s main roads which are equipped with 22 variable message signs, 161 regulatory speed signs and automati
  • February 27, 2013
    Consortium wins Polish rail modernisation contract
    A consortium led by Bombardier Transportation in partnership with Thales and Nokia Siemens Networks has won the US$146 million contract to modernise the signalling of the 350 km long E65 railway line linking Warsaw and Gdynia. The need to comply with the standards of the trans-European transport network linking the north and south of Europe makes the contract is one of the most important investments of PKP, the Polish railway lines operator. The consortium claims the modernisation will enhance safety and in
  • February 1, 2012
    Traffic Tech commissions Qatar's first tunnel management system
    Traffic Tech (Gulf), in partnership with Telegra, has commissioned the first tunnel management system in Qatar, an ITS project implemented on the newly opened Ras Abu Aboud Tunnel that links Corniche and Wakrah Road, leading to the New Doha International Airport.
  • January 9, 2015
    Chinese company confirms Mexico train tender plans
    China Railway Construction Corp (CRCC) has confirmed its intention to participate in the new tender for the US$3.4 billion Mexico City-Querétaro high-speed rail project. Mexico's transport and communications ministry (SCT) said draft bidding rules for the new tender would be published on 14 January. The project calls for the construction of a 210km high-speed rail link connecting Mexico and Querétaro, via the cities of Cuatitlán and Tula. The high speed train will run for 210 kilometres between Buenav