Skip to main content

Go-ahead for Richmond-to-Raleigh high-speed rail proposal

The US Department of Transportation (DOT)’s Federal Railroad Administration (FRA), the State of North Carolina and the Commonwealth of Virginia have signed off on the Final Environmental Impact Statement (FEIS) for the proposed Richmond to Raleigh (R2R) passenger rail line along the Southeast Corridor. The completion of the FEIS is one of the final steps necessary before construction of the project can move forward once funding is secured. The 162-mile route between the two cities would utilise existing
September 21, 2015 Read time: 2 mins
The 324 US Department of Transportation (DOT)’s Federal Railroad Administration (FRA), the State of North Carolina and the Commonwealth of Virginia have signed off on the Final Environmental Impact Statement (FEIS) for the proposed Richmond to Raleigh (R2R) passenger rail line along the Southeast Corridor. The completion of the FEIS is one of the final steps necessary before construction of the project can move forward once funding is secured.

The 162-mile route between the two cities would utilise existing and former rail lines for approximately 60 per cent of the route and is planned to be free from at-grade crossings of track and roads. This route is part of a larger multi-state planning effort to provide high-speed passenger service between Washington, D., and Atlanta. In July, US Transportation Secretary Anthony Foxx announced that the Department of Transportation would invest approximately US$1 million to develop a regional long-term vision for the corridor and engage states and stakeholders to help the region form a governance organisation that can sustain planning efforts and implement the vision.

“Without a strong passenger rail system, the Southeast’s growth will be choked by congestion for a very long time,” Foxx said. “North Carolina, Virginia and the Department of Transportation have worked together to bring us closer to high-speed rail connecting Richmond and Raleigh, and I urge everyone involved to continue pushing this effort forward. High-speed rail in this region is not a luxury but a necessity.”

“Today brings us closer to breaking ground on this critical project for one of the fastest growing areas of the country.  The project will improve safety and reliability, reduce the travel time between Richmond and Raleigh, and increase opportunity for jobs and growth in the Southeast,” FRA Acting Administrator Sarah Feinberg said.

For more information on companies in this article

Related Content

  • Integrated corridor management aids multi-modal transport planning
    January 24, 2012
    Telvent’s Jorgen Pedersen and Tip Franklin discuss how integrated corridor management can create synergies within a multimodal transportation infrastructure, while promoting modal shift. The mantra ‘We cannot build ourselves out of congestion’ has long been stated and too often ignored. But with the economy in dire straits, funding deficits and pressure to reduce governmental spending, this is now being taken seriously by almost everyone who has an interest in the flow of traffic. By ‘everyone’ we include
  • Canadian government proposes US$470 million for new bridge
    February 13, 2014
    The government of Canada has allotted US$470 million for the New International Trade Crossing bridge project between Detroit and Windsor, despite concerns that the US federal government is dragging its feet on its obligation to spend at least US$200 million on a US customs plaza. The project would see a six-lane bridge built on what the government says is the most important international land crossing in North America, handling 30 per cent of Canada-US trade carried by truck. The new bridge will ensur
  • Indra to implement high speed rail traffic management system
    September 8, 2014
    State Turkish Rail (TCDD) has awarded Indra a US$55 million contract to implement a planning system for its entire rail network, together with a high-speed train management system. Indra will set up a new control centre in Ankara, equipped with cutting-edge technology, which will carry out operational planning for the country's 12,000 kilometre rail network, both conventional lines and high-speed tracks. In addition, Indra’s DaVinci rail traffic management system will support comprehensive high-speed
  • EVs: Time for a rethink
    December 14, 2021
    Given a growing body of evidence that EVs are not the clean, green machines they are made out to be, Andrew Bunn suggests they can only be part of the puzzle – not the answer to environmental problems