Skip to main content

Go-ahead for Richmond-to-Raleigh high-speed rail proposal

The US Department of Transportation (DOT)’s Federal Railroad Administration (FRA), the State of North Carolina and the Commonwealth of Virginia have signed off on the Final Environmental Impact Statement (FEIS) for the proposed Richmond to Raleigh (R2R) passenger rail line along the Southeast Corridor. The completion of the FEIS is one of the final steps necessary before construction of the project can move forward once funding is secured. The 162-mile route between the two cities would utilise existing
September 21, 2015 Read time: 2 mins
The 324 US Department of Transportation (DOT)’s Federal Railroad Administration (FRA), the State of North Carolina and the Commonwealth of Virginia have signed off on the Final Environmental Impact Statement (FEIS) for the proposed Richmond to Raleigh (R2R) passenger rail line along the Southeast Corridor. The completion of the FEIS is one of the final steps necessary before construction of the project can move forward once funding is secured.

The 162-mile route between the two cities would utilise existing and former rail lines for approximately 60 per cent of the route and is planned to be free from at-grade crossings of track and roads. This route is part of a larger multi-state planning effort to provide high-speed passenger service between Washington, D., and Atlanta. In July, US Transportation Secretary Anthony Foxx announced that the Department of Transportation would invest approximately US$1 million to develop a regional long-term vision for the corridor and engage states and stakeholders to help the region form a governance organisation that can sustain planning efforts and implement the vision.

“Without a strong passenger rail system, the Southeast’s growth will be choked by congestion for a very long time,” Foxx said. “North Carolina, Virginia and the Department of Transportation have worked together to bring us closer to high-speed rail connecting Richmond and Raleigh, and I urge everyone involved to continue pushing this effort forward. High-speed rail in this region is not a luxury but a necessity.”

“Today brings us closer to breaking ground on this critical project for one of the fastest growing areas of the country.  The project will improve safety and reliability, reduce the travel time between Richmond and Raleigh, and increase opportunity for jobs and growth in the Southeast,” FRA Acting Administrator Sarah Feinberg said.

For more information on companies in this article

Related Content

  • AVs coming to Florida mobility corridor 
    March 4, 2022
    Jacksonville Transportation Authority project supported by $12.5m grant from USDoT
  • The role of GIS in climate change resiliency
    May 29, 2014
    Climate change will pose global and local challenges and that includes risks to the transportation infrastructure. Climate change adaptation and resiliency has captured the attention of the transportation community for some time now. Because transportation infrastructure is often designed to last for 30, 50, or 100 years or even longer, transportation professionals are concerned not only about the impact on our existing investments, but also how to design more durable transportation systems for the future
  • Voting for change - the democratisation of transportation
    December 8, 2014
    Contra Costa is using an innovative planning method to gather suggestions and craft future transportation spending plans. Public opinion in matters relating to transport rarely exceeds complaints about congestion on the roads, crowded metros, slow buses with ‘exorbitant’ fares or perhaps enforcement cameras.
  • Pricing practise for HOT lane operation
    May 11, 2017
    Timothy Compston weighs up the critical elements that keep the wheels of dynamic pricing schemes turning in today's high-occupancy toll (HOT) lanes. In the drive towards smarter tolling it is perhaps not surprising that sophisticated pricing algorithms are being rolled out to better reflect supply and demand on the roadway. This is the case with high-occupancy toll (HOT) lanes which a growing number of DoTs are seeing as a way of smoothing the operation of their existing, and planned, freeway infrastructure