Skip to main content

Go-ahead for Richmond-to-Raleigh high-speed rail proposal

The US Department of Transportation (DOT)’s Federal Railroad Administration (FRA), the State of North Carolina and the Commonwealth of Virginia have signed off on the Final Environmental Impact Statement (FEIS) for the proposed Richmond to Raleigh (R2R) passenger rail line along the Southeast Corridor. The completion of the FEIS is one of the final steps necessary before construction of the project can move forward once funding is secured. The 162-mile route between the two cities would utilise existing
September 21, 2015 Read time: 2 mins
The 324 US Department of Transportation (DOT)’s Federal Railroad Administration (FRA), the State of North Carolina and the Commonwealth of Virginia have signed off on the Final Environmental Impact Statement (FEIS) for the proposed Richmond to Raleigh (R2R) passenger rail line along the Southeast Corridor. The completion of the FEIS is one of the final steps necessary before construction of the project can move forward once funding is secured.

The 162-mile route between the two cities would utilise existing and former rail lines for approximately 60 per cent of the route and is planned to be free from at-grade crossings of track and roads. This route is part of a larger multi-state planning effort to provide high-speed passenger service between Washington, D., and Atlanta. In July, US Transportation Secretary Anthony Foxx announced that the Department of Transportation would invest approximately US$1 million to develop a regional long-term vision for the corridor and engage states and stakeholders to help the region form a governance organisation that can sustain planning efforts and implement the vision.

“Without a strong passenger rail system, the Southeast’s growth will be choked by congestion for a very long time,” Foxx said. “North Carolina, Virginia and the Department of Transportation have worked together to bring us closer to high-speed rail connecting Richmond and Raleigh, and I urge everyone involved to continue pushing this effort forward. High-speed rail in this region is not a luxury but a necessity.”

“Today brings us closer to breaking ground on this critical project for one of the fastest growing areas of the country.  The project will improve safety and reliability, reduce the travel time between Richmond and Raleigh, and increase opportunity for jobs and growth in the Southeast,” FRA Acting Administrator Sarah Feinberg said.

For more information on companies in this article

Related Content

  • MaaS must be seamless and invisible - or forget it
    June 5, 2018
    MaaS experts from around the world converged on ITS International’s MaaS Market Atlanta conference to talk about how MaaS can be implemented in the US. Andrew Bardin Williams had a front row seat. Transportation experts from around the world gathered in the US earlier this month to discuss the future of Mobility as a Service (MaaS) and how it could be deployed in the US market. While most attendees at ITS International’s MaaS Market Atlanta conference were familiar with the MaaS concept, the US’s highly
  • US DOT launches Infrastructure for Rebuilding America (INFRA) Grant Program
    July 4, 2017
    The Department of Transportation (DOT) has announced the Infrastructure for Rebuilding America (INFRA) discretionary grant program, which will make approximately US$1.5 billion available to projects that are in line with the Administration’s principles to help rebuild America’s infrastructure.
  • Arup reveals its vision of the future of rail
    July 2, 2014
    Engineering and consulting firm Arup has unveiled its vision of the future of rail travel in the light of trends such as urban population growth, climate change and emerging technologies. The Future of Rail 2050 foresees predictive maintenance of rail lines by robot drones; driverless trains travelling safely at high speed, freight delivered automatically to its destination, and smart technology designed to improve passenger experience and enable ticketless travel. According to Colin Stewart, Global
  • Trans-Pennine road tunnel routes shortlisted, may include special lighting, caverns
    August 19, 2016
    Five routes have been shortlisted for the Trans-Pennine tunnel – the most ambitious road scheme undertaken in the UK in more than five decades. The Trans-Pennine tunnel study was launched by the government in autumn 2015, one of a number of studies aimed at addressing some of the biggest challenges facing the road network in the UK. The latest interim study shows the continued strong case for the tunnel which could provide safer, faster and more reliable journeys for motorists. All five routes join th