Skip to main content

GetCharged unveils e-scooter charger in New York City

Micromobility firm GetCharged has unveiled a charging and docking station for electric scooters in New York City. Andrew Fox, GetCharged co-founder, says cities continue to use micromobility as an option to “ease pressures on public transportation and congestion”. "However, significant pitfalls remain with the dockless model, such as cluttered streets and sidewalks and the risk of fire when charging multiple scooters in residential buildings, he continues. “Charge provides vital infrastructure for riders
August 20, 2019 Read time: 2 mins

Micromobility firm GetCharged has unveiled a charging and docking station for electric scooters in New York City.

Andrew Fox, GetCharged co-founder, says cities continue to use micromobility as an option to “ease pressures on public transportation and congestion”.

"However, significant pitfalls remain with the dockless model, such as cluttered streets and sidewalks and the risk of fire when charging multiple scooters in residential buildings, he continues. “Charge provides vital infrastructure for riders and ride-share operators by offering a convenient place to charge and store e-vehicles, helping protect the integrity of city streets and keeping pedestrians and residents safe.”

Paul Vallone, member for New York City Council, says the charging stations are compatible with e-bikes and would help ensure the streets “remain clear, organised and safe while encouraging the use of innovative transportation solutions”.

Ydanis Rodriguez, member for New York City Council, says the pilot will obtain feedback from riders and gain an understanding on the impact of the stations on surrounding communities.

"I will continue to work alongside my colleagues at the council to ensure we embrace the many benefits micromobility brings to the City,” he adds.

The charging and docking station is in Worth Square located at 200 5th Avenue (on Broadway, between 24th & 25th).

Related Content

  • Four expansions added to Virginia’s Smart Road to test AVs in urban, rural and residential environments
    November 27, 2017
    The Virginia Tech Transportation Institute and the Virginia Department of Transportation (VDoT) has unveiled four expansions to the Virginia Smart Road to accelerate advanced-vehicle testing and explore how automated and autonomous vehicles (AVs) will function on U.S. roadways including edge-and-corner environments. Two new facilities have opened for testing: The Surface Street Expansion, an urban test bed, and the Live Roadway Connector, which connects the Smart road to the U.S. Route 460-Business,
  • Tech advances create MaaS without compromise
    August 29, 2019
    Advances in technology make it possible for authorities to compile and maintain MaaS platforms cheaply - and without relinquishing control to third parties. Colin Sowman finds out more… It is increasingly clear that local authorities’ reluctance to implement Mobility as a Service (MaaS) is based on politics and finance. However, the technology underpinning MaaS is evolving rapidly and is presenting new solutions. At its heart, the political resistance comes down to the divide between the ethos of public
  • New York mayor to reduce city’s vehicle fleet
    April 11, 2019
    New York’s mayor Bill de Blasio has signed an executive order to reduce the city’s on-road public sector vehicle fleet. The move is part of a commitment to reduce emissions by 80% by 2050. The city will remove 1,000 vehicles from its fleet by June 2021 and reduce the number of take-home vehicles by at least 500. Additionally, it will replace at least 350 SUVs with electric plug-in sedans and promote greater vehicle efficiency by using advanced data collection. “Eliminating unnecessary vehicles fro
  • ChargeWheel sparks mobile EV charging in San Francisco
    April 8, 2019
    ChargeWheel has secured $1 million in funding to launch a mobile electric vehicle (EV) charging network in the San Francisco Bay Area. The network will be based on ChargeWheel’s mobile Energy Trailers, which don’t require a connection to the grid, and can therefore operate in any car park. The company says they offer a combined solar-powered generation and energy storage solution, and plans to deploy 100 in the Bay Area by the end of 2019. The units can simultaneously charge four EVs or up to 400 electric