Skip to main content

German company scoops Turkish order for train safety systems

Turkish train manufacturer Durmazlar has ordered 60 train monitoring and control systems from German supplier BBR for the expansion of the metro system in Bursa. BBR will supply its multi-function PZB222 safety systems for 60 new and ten old vehicles to monitor speed and control the train: if a train passes a stop signal or exceeds the permitted speed limit, an automatic braking system is triggered, taking into account safety specifications relating to its position on the track. Coupling coils on the tra
October 30, 2015 Read time: 2 mins

Turkish train manufacturer 8259 Durmazlar has ordered 60 train monitoring and control systems from German supplier BBR for the expansion of the metro system in Bursa.

BBR will supply its multi-function PZB222 safety systems for 60 new and ten old vehicles to monitor speed and control the train: if a train passes a stop signal or exceeds the permitted speed limit, an automatic braking system is triggered, taking into account safety specifications relating to its position on the track. Coupling coils on the train and track exchange information on the speed or inclination of the track.

Using these data as well as individual vehicle properties, the system calculates a braking curve to match the situation. Display units keep the driver continuously informed about his target and actual speeds.

BBR has been supplying systems for the Bursa metro system since 2012; managing director Frank-Michael Rösch says, "This order from Bursa which is now the fourth, shows that our systems are proving their worth.”

Bursa is the fourth largest town in Turkey with a population of around 1.8 million.

The metro system has been extended several times since it opened in 2002 and the network now comprises a distance of 39 kilometres, 38 stations and currently over 80 trains.

For more information on companies in this article

Related Content

  • Mexico’s Durango-Mazatlan highway sets tunnel safety standard
    August 26, 2016
    Mauro Nogarin looks at the management of the longer tunnels on Mexico’s Durango-Mazatlan highway. In recent years the National Infrastructure Fund of Mexico has increased investment in the installation of ITS systems on selected highways to increase road safety. One such major investment is the 230km long Durango-Mazatlan highway which is 12m in width and has an average speed of 110km/h.
  • More than half of UK’s new cars sold with autonomous safety tech
    April 4, 2016
    Self driving cars may seem years away, but more than 1.5 million UK motorists a year now leave showrooms in cars featuring self-activating safety systems, according to analysis revealed by the Society of Motor Manufacturers and Traders (SMMT).

    Data from SMMT and JATO Dynamics shows that more than half of new cars registered in 2015 were fitted with safety-enhancing collision warning systems, with other technologies such as adaptive cruise control, autonomous emergency braking and blind spot monitoring also surging in popularity.
  • IRD complements WIM with tyre under-inflation detection
    May 8, 2015
    To complement its existing WIM offering, IRD has introduced a system to detect under-inflated and flat tyres at highway speeds. Tyre inflation pressure has both safety and economic impacts for road users and none more so than with commercial vehicles. An underinflated tyre has decreased directional control, increased risk of catastrophic failure, and negatively impacts tyre life and fuel economy. In June 2014 the USDOT published Large Truck and Bus Crash Facts 2012 in which the Federal Motor Carrier Safety
  • Indra wins in India with two transport and traffic contracts
    November 30, 2015
    Indra has increased its penetration of the Indian transport and traffic by winning two contracts with a total value of US$12.5 million to deploy its technology in the longest tunnel in Southeast Asia, between Chenani and Nashri, and in the Navi Mumbai metro system, in India's financial capital, both currently under construction. Under the first contract, Indra is responsible for the design, supply, set-up and rollout of the control system for the 9.2 km long tunnel and will equip the control center with