Skip to main content

German company scoops Turkish order for train safety systems

Turkish train manufacturer Durmazlar has ordered 60 train monitoring and control systems from German supplier BBR for the expansion of the metro system in Bursa. BBR will supply its multi-function PZB222 safety systems for 60 new and ten old vehicles to monitor speed and control the train: if a train passes a stop signal or exceeds the permitted speed limit, an automatic braking system is triggered, taking into account safety specifications relating to its position on the track. Coupling coils on the tra
October 30, 2015 Read time: 2 mins

Turkish train manufacturer 8259 Durmazlar has ordered 60 train monitoring and control systems from German supplier BBR for the expansion of the metro system in Bursa.

BBR will supply its multi-function PZB222 safety systems for 60 new and ten old vehicles to monitor speed and control the train: if a train passes a stop signal or exceeds the permitted speed limit, an automatic braking system is triggered, taking into account safety specifications relating to its position on the track. Coupling coils on the train and track exchange information on the speed or inclination of the track.

Using these data as well as individual vehicle properties, the system calculates a braking curve to match the situation. Display units keep the driver continuously informed about his target and actual speeds.

BBR has been supplying systems for the Bursa metro system since 2012; managing director Frank-Michael Rösch says, "This order from Bursa which is now the fourth, shows that our systems are proving their worth.”

Bursa is the fourth largest town in Turkey with a population of around 1.8 million.

The metro system has been extended several times since it opened in 2002 and the network now comprises a distance of 39 kilometres, 38 stations and currently over 80 trains.

For more information on companies in this article

Related Content

  • TagMaster wins order from Bombardier for São Paulo Line 5 Project
    July 25, 2012
    Sweden-headquartered TagMaster has received an order from Bombardier Transportation to provide its advanced RFID solution for a project to upgrade and extend the signalling on Line 5 on the São Paulo Metro in Brazil. Bombardier has placed an initial order for Heavy-duty (HD) readers and ID-tags which will be delivered over a 12 month period beginning in August 2012. Additional orders for TagMaster’s Heavy-duty ID-Tags and system spare parts for the project are anticipated during 2013.
  • Alstom wins new Kochi metro line contracts
    January 23, 2015
    Alstom has been awarded two contracts worth over US$73 million by Delhi Metro Rail Corporation (DMRC) to supply signalling, telecom and electrification solutions for the new Kochi metro line. The projects will be implemented in early 2016 and commercial service is scheduled to begin in March 2016. The contracts include 25 Alstom Metropolis trains which will circulate on the new Kochi metro line which is 25 kilometres long and includes 22 stations. These trains will carry up to 15,000 passengers per hour
  • City Safety reduces low speed accidents on Volvo’s XC60 and S60
    May 29, 2013
    It was four years ago that Volvo introduced its City Safety collision avoidance system which is designed to reduce the number and severity of low-speed accidents to the US market. However, a study in America by the Highway Loss Data Institute (HLDI) has shown that the results may not be as good as initially indicated by an earlier report. According to Volvo, statistics show that 75% of reported collisions occur at speeds of up to 30km/h (18.6mph) typically in urban traffic and in slow-moving traffic queues
  • B&C Transit modernises Miami-Dade Metrorail’s control systems
    June 1, 2016
    Jason Gomez and Daniel Mondesir describe how passenger disruption was minimised during a major upgrading of the control room of Miami-Dade’s Metrorail. In 1984 when the Miami-Dade Department of Transportation and Public Works’ (DTPW) Metrorail system was launched in southern Florida, trains ran 18km along a single line and stopped at 10 stations.