Skip to main content

GE Energy forges charger agreement with Coda Automotive

GE Energy Industrial Solutions has finalised an automotive original equipment manufacturer (OEM) agreement for the sale and distribution of the GE WattStation wall mount electric vehicle (EV) charging station with EV manufacturer, Coda Automotive.
March 23, 2012 Read time: 1 min
940 GE Energy Industrial Solutions has finalised an automotive original equipment manufacturer (OEM) agreement for the sale and distribution of the GE WattStation wall mount electric vehicle (EV) charging station with EV manufacturer, 4277 Coda Automotive.

TheWattSation, a fast, easy-to-use Level 2 EV charger, significantly decreases the time required to fully charge an electric vehicle compared with a Level 1 charger. The Coda five-passenger, mid-size sedan is equipped with a 36 kWh battery pack that enables a fully charged Coda to go up to 150 miles. The company provides a 10-year, 100,000-mile battery warranty and a US base price of $39,900.

“This milestone is another step in GE’s journey to lead the future of global electrification,” said Luis Ramírez, CEO of GE Energy Industrial Solutions. “As demand for the GE WattStation continues to exceed our expectations, bringing our products closer to the customer will help accelerate the adoption of electric vehicles.”

For more information on companies in this article

Related Content

  • EVgo adds second-life batteries to charging system
    October 15, 2018
    EVgo has added second-life BMW i3 batteries to its Union City fast-charging station in California to help store energy during peak solar hours and reduce strain on the grid. This energy is then used to deliver a fast charge to EVgo customers’ electric vehicles during periods of high demand. The second-life battery system integrates two BMW i3 battery packs into a single housing. Evgo says each battery pack has a capacity of 22kWh which combines with a 30kW inverter to offer a 30kW/44kWh energy storage
  • ABB launches EV chargers for US and Europe
    May 31, 2013
    ABB has launched its Terra SmartConnect (SC) fast chargers for electric vehicles (EV) in North America. Terra SC can fully charge an electric car in thirty to 120 minutes and will be available with support for the CHAdeMO fast-charging standard, with SAE/combined charging system and will be available in the Americas in the second quarter of 2013. The charger has a full-colour eight inch touchscreen user interface, smart connectivity features and wall-mount connections, as well as optional features of RFiD a
  • Zero emission delivery vehicle project begins in Houston
    September 2, 2013
    The Houston-Galveston Area Council (H-GAC) has teamed up with the Center for Transportation and the Environment (CTE) and Smith Electric Vehicles Corporation to reduce vehicle emissions from delivery trucks in the region. As part of a US Department of Energy (DOE) sponsored effort, local fleets will replace existing diesel delivery vehicles with thirty all-electric medium and heavy-duty Smith Newton trucks for daily operations in the Houston-Galveston area.
  • EVs stir interest but face obstacles – IBM study
    May 18, 2012
    Many automobile industry executives believe that sales of traditional vehicles will peak before 2020 and are looking to electric-only vehicles (EVs) as one of the next hot products, but they will first have to address stringent consumer requirements about EV performance, recharging, and convenience, according to a new IBM survey of consumer attitudes and a recent study of auto industry executives.