Skip to main content

GE and Deutsche Bahn partnership to optimise rail operations

GE and Deutsche Bahn Energie (DB Energie) are partnering to optimise Deutsche Bahn’s rail network’s power supply. Working with DB Energie, GE Energy Management will provide the technology and expertise that will couple energy fed from the utility grid to the rail grid, ensuring a more efficient and constant power supply. The solution ensures efficient power conversion and high power quality, optimising rail system operations. Scheduled for delivery between 2017 and 2018, the converter station built by G
November 6, 2015 Read time: 2 mins
940 GE and 5344 Deutsche Bahn Energie (DB Energie) are partnering to optimise Deutsche Bahn’s rail network’s power supply.  Working with DB Energie, GE Energy Management will provide the technology and expertise that will couple energy fed from the utility grid to the rail grid, ensuring a more efficient and constant power supply. The solution ensures efficient power conversion and high power quality, optimising rail system operations.

Scheduled for delivery between 2017 and 2018, the converter station built by GE will convert power from the public utility grid, operating at a frequency of 110kV/50Hz, to feed into the de-central rail network 15kV/16.7Hz. This solution aims to maximise efficiency through reducing the power consumption in the railway system on the two sites in Bützow and Schwerin in northern Germany. GE Power Conversion’s static frequency converter (SFC) solution ensures a reliable electrical conversion at a high efficiency rate.

These solutions can also enable 50 Hz rail operators worldwide to avoid unbalanced utility grid loads and the resulting costs from it, as well as reduce complexity in the system by bringing down the number of feeder stations required and by eliminating the ‘dead zone’ in overhead catenary lines. It helps optimize rail system operation and the solution will ultimately reduce failure time and maintenance needed.

“With our power quality solution, we offer flexibility to connect rail grid to power grids at different locations or from different providers. The continuous partnership with DB Energie shows GE’s solution stands the test of time and the reliable solution for rail operators.” says John Chatwin, power and industry segment leader, GE Power Conversion.

Related Content

  • February 17, 2017
    GE and Transnet partner to transform Africa’s transport sector
    GE Transportation and Transnet, Africa’s rail and ports operator, have announced a digital partnership to seamlessly connect shippers and transport operators, in a bid to make it easier for a company to understand pricing and capacity on the network, plan a shipment and get their goods to market. The solution will be enabled by Predix, the operating system for the industrial internet and will connect shippers and transport operators by providing real-time, data-driven insights on the status of shipments.
  • July 17, 2015
    London suburb installs on-street EV charging
    Electric vehicle (EV) charging solutions provider, APT Technologies has supplied and installed three of its very latest Tri-Rapid Chargers at sites in Shoreditch, Dalston and Hackney Central in London. Charging at 43kW AC power and 50kW DC power, the highly efficient Tri-Rapid Chargers have an eight-inch LCD screen ensuring simple user interaction, real-time consumption data and a constantly refreshed charging cost, measured on a pay-as-you-go basis. A sub-15 minute charging time ensures a fast and e
  • April 1, 2021
    Rhombus helps V2G school bus deployment 
    Blue Bird school buses will be involved in Vehicle to Grid production deployment
  • January 25, 2016
    Siemens to electrify metro lines in Peru
    Siemens has been awarded a contract by Ansaldo STS to electrify the new double-track metro line 2 in Peru’s capital city, Lima, as well as the eight kilometre-long first phase of line 4 in the city. The two new metro lines will connect additional city districts and the international airport to the capital's mass transit network. The contract also includes the simultaneous extension of line 2 to the airport, the first phase of the future line 4. The project includes six feeder stations, two 20 kV cable