Skip to main content

GE and Deutsche Bahn partnership to optimise rail operations

GE and Deutsche Bahn Energie (DB Energie) are partnering to optimise Deutsche Bahn’s rail network’s power supply. Working with DB Energie, GE Energy Management will provide the technology and expertise that will couple energy fed from the utility grid to the rail grid, ensuring a more efficient and constant power supply. The solution ensures efficient power conversion and high power quality, optimising rail system operations. Scheduled for delivery between 2017 and 2018, the converter station built by G
November 6, 2015 Read time: 2 mins
940 GE and 5344 Deutsche Bahn Energie (DB Energie) are partnering to optimise Deutsche Bahn’s rail network’s power supply.  Working with DB Energie, GE Energy Management will provide the technology and expertise that will couple energy fed from the utility grid to the rail grid, ensuring a more efficient and constant power supply. The solution ensures efficient power conversion and high power quality, optimising rail system operations.

Scheduled for delivery between 2017 and 2018, the converter station built by GE will convert power from the public utility grid, operating at a frequency of 110kV/50Hz, to feed into the de-central rail network 15kV/16.7Hz. This solution aims to maximise efficiency through reducing the power consumption in the railway system on the two sites in Bützow and Schwerin in northern Germany. GE Power Conversion’s static frequency converter (SFC) solution ensures a reliable electrical conversion at a high efficiency rate.

These solutions can also enable 50 Hz rail operators worldwide to avoid unbalanced utility grid loads and the resulting costs from it, as well as reduce complexity in the system by bringing down the number of feeder stations required and by eliminating the ‘dead zone’ in overhead catenary lines. It helps optimize rail system operation and the solution will ultimately reduce failure time and maintenance needed.

“With our power quality solution, we offer flexibility to connect rail grid to power grids at different locations or from different providers. The continuous partnership with DB Energie shows GE’s solution stands the test of time and the reliable solution for rail operators.” says John Chatwin, power and industry segment leader, GE Power Conversion.

For more information on companies in this article

Related Content

  • Yunex Traffic launches Yutraffic Actis
    September 19, 2024
    Product replaces Helios signals range and includes new mounting solution
  • Trains and no planes or automobiles
    August 3, 2021
    Moves are afoot in France and Germany for legislation to prioritise rail over air travel. Iomob’s Boyd Cohen suggests that Mobility as a Service can help to support this shift
  • Swarco puts the DVSA in control with new prism sign installation
    May 20, 2015
    Five prism signs have been installed Swarco Traffic to manage traffic control approaching an Enforcement Checksite operated by the Driver & Vehicle Standards Agency (DVSA) on the M74 motorway in Scotland. The signs have been installed at strategic points along the M74 by Beattock Summit to guide heavy vehicles into the nearside lane and direct selected vehicles into the weighbridge and inspection area. The signs feature a combination of control solutions with urban traffic management and control (UTMC)
  • Axis aids incident detection on French viaduct
    October 31, 2016
    France’s first AID system has halved attendance time on the Calix Viaduct. TheCentre for Traffic Engineering and Management (CIGT) at Caen in northern France manages 367km of the national network in the Manche/Calvados district including the 1.2km long, 15-span Calix Viaduct across the Canal de Caen à la Mer.