Skip to main content

Further motorway construction win for Strabag in Poland

Construction group Strabag has been awarded a contract to build a further section of the A1 motorway in Poland. Following the award of the construction of the Woźniki–Pyrzowice section, the group will now build the 16.7 km long stretch between the Zawodzie Junction and Woźniki Junction. The project, which has a value of US$118 million (€108 million), is expected to be opened to traffic in the second half of 2019.
March 7, 2016 Read time: 1 min
RSSConstruction group 3861 Strabag has been awarded a contract to build a further section of the A1 motorway in Poland. Following the award of the construction of the Woźniki–Pyrzowice section, the group will now build the 16.7 km long stretch between the Zawodzie Junction and Woźniki Junction.

The project, which has a value of US$118 million (€108 million), is expected to be opened to traffic in the second half of 2019.

This section of motorway is part of the A1 running from Gdansk in the north to the Czech border. It forms part of European Route 75. In addition to the concrete roadway, Strabag will also build the Woźniki Junction as well as bridges and several adjoining local roads.

For more information on companies in this article

Related Content

  • Road user charging potential solution to transportation problems
    December 14, 2012
    A number of new and highly significant open road tolling schemes have just been launched or are soon to ‘go live’. Systems of road user charging are flexing their muscles as the means to solve politically sensitive transportation problems, reports Jon Masters. Gothenburg, January 2013, will be the time and place for the launch of the next city congestion charging scheme in Europe. In a separate development, Los Angeles County’s tolled Metro ExpressLanes began operating in November 2012 – the latest in a ser
  • ATS reports robust second quarter
    April 18, 2012
    American Traffic Solutions (ATS) is claiming a robust second quarter that saw 28 communities sign contracts/notices to proceed for 274 red-light and speed-compliance safety cameras, a sharp increase from the 29 contracts/notices to proceed for 170 cameras in the first quarter.
  • App informs drivers of delays during Long Beach bridge replacement
    June 6, 2014
    David Crawford previews a work zone travel breakthrough. In February 2014, the Port of Long Beach in California launched what it claims is a groundbreaking construction zone navigation aid - LB Bridge mobile app. The app is designed to help drivers during the Gerald Desmond Bridge replacement programme by keeping them up to date on activity and the ensuing traffic diversions when construction starts in summer 2014. The unusually content-rich app is designed to convey current project news (enlivened by phot
  • Kapsch flows free in France
    December 2, 2022
    New toll system on A79 set to process 15,000 vehicles per day along 88km stretch