Skip to main content

FTA supports A9 HGV speed limit trial

The Freight Transport Association (FTA) has given its support to the HGV speed limit trial which commences on the A9 in Scotland on Tuesday 28 October. The pilot project on the A9 will raise the speed limit on the single carriageway sections between Perth and Inverness from 40 to 50mph for heavy goods vehicles which have a laden weight exceeding 7.5 tonnes. The trial, which will last 36 months and is to be introduced at the same time as a new average speed camera system, is aimed at improving the opera
October 10, 2014 Read time: 2 mins
The 6983 Freight Transport Association (FTA) has given its support to the HGV speed limit trial which commences on the A9 in Scotland on Tuesday 28 October.
 
The pilot project on the A9 will raise the speed limit on the single carriageway sections between Perth and Inverness from 40 to 50mph for heavy goods vehicles which have a laden weight exceeding 7.5 tonnes.  The trial, which will last 36 months and is to be introduced at the same time as a new average speed camera system, is aimed at improving the operational performance of the route.
 
Malcolm Bingham, FTA’s Head of Road Network Management Policy, said: “FTA is in full support of the 50mph speed limit trial for HGVs on the A9 and we look forward to its introduction on 28 October.  We welcome the opportunity for such a trial as we believe the current differential in speed limits between HGVs and other vehicles increases the road safety risk.  This trial will provide some much needed evidence to help determine if there are any advantages, on safety grounds, in setting the speed limit of an HGV to 50mph."
 
The A9 remains one of Scotland's most important links. The 2112 Scottish Government is committed to dualling the route between Perth and Inverness by 2025 and the pilot is part of wider engineering, enforcement and education measures being delivered in advance of the dualling programme.

Related Content

  • September 22, 2014
    FTA disappointed at Dartford free-flow toll delay
    ‘The delay of the introduction of free-flow tolls at Dartford River Crossing disappointing as it may present additional costs to industry’ is the message from the Freight Transport Association (FTA). The Association has voiced its concern in response to the announcement by the Highways Agency (HA) that the planned technology to allow motorists to use the crossing without having to stop at barriers and pay is to be delayed by up to four weeks. Originally planned to be in place by the 28 October 2014, th
  • May 28, 2013
    FTA launches cycle-friendly HGV sat-nav
    As part of its continuing efforts to raises safety standards in the logistics industry, the UK’s Freight Transport Association (FTA) launched what it says is the world’s first satellite navigation system incorporating an HGV Cyclist Alert system. Currently only available in London, the Pro Nav 420’s HGV Cyclist Alert warns the truck driver when approaching a section of road that has been designated by Transport for London (TfL) as a “HGV/Cyclist convergence area”, such as junctions where large numbers of HG
  • December 13, 2013
    FTA demands no more delay in new Thames Crossing
    Responding to the yesterday’s announcement that there is still no definitive answer to the location of the new Thames Crossing, the message from the Freight Transport Association (FTA) was “don’t delay and let the building begin to help improve capacity and ease congestion at Dartford as soon as possible”. The Government has stated that Option B connecting the A2 Swanscombe Peninsula with the A1089 has been ruled out of the process, but has failed to confirm as to where the new Lower Thames crossing wil
  • December 20, 2016
    M6 should be priority for Government investment, drivers tell FTA
    The Freight Transport Association (FTA) has been looking at stretches of the UK’s strategic road network that would most benefit from Government investment following the Chancellor’s commitment in his Autumn Statement to fund improvements to congestion hot spots. Philip Hammond said the Government would spend IS$1.6 billion (£1.3 billion) on improving England’s roads, including US$222 million (£220 million) on tackling congestion at pinch points and US$33 million (£27 million) on an expressway connecting Ox