Skip to main content

‘Formation flying’ engineering trains used to upgrade railway

In a bid to increase efficiencies and reduce delays for passengers, the UK’s Network Rail is trialling ‘formation flying’ engineering trains to repair and renew the 20,000 miles of railway track it is responsible for maintaining. It says this new approach to engineering could potentially save taxpayer-funded Network Rail US$313,000 (£250,000) per week in costs by allowing trains to run at higher speeds once engineering is complete. The pioneering technique was used successfully at Sandy, Bedfordshire, on
February 16, 2017 Read time: 2 mins
In a bid to increase efficiencies and reduce delays for passengers, the UK’s 5021 Network Rail is trialling ‘formation flying’ engineering trains to repair and renew the 20,000 miles of railway track it is responsible for maintaining. It says this new approach to engineering could potentially save taxpayer-funded Network Rail US$313,000 (£250,000) per week in costs by allowing trains to run at higher speeds once engineering is complete.

The pioneering technique was used successfully at Sandy, Bedfordshire, on a set of railway switches and crossings, which were being replaced as part of the Railway Upgrade Plan.

A pair of engineering trains were joined together connected by an umbilical and ran in parallel to simultaneously deliver tamping and dynamic track stabilisation (DTS) which simulated the equivalent of 200 trains passing over the tracks consecutively. Passenger trains were then able to start using the railway at speeds as high as 125mph as soon as the engineering team had finished because the track and ballast were firmly ‘bedded in’ – which meant Network Rail avoided thousands of pounds in compensation payments.

The news comes almost one year after Network Rail’s first successes with 125mph ‘high speed handbacks’ in January 2016 on regular plain line track. High speed handback ensures track is installed at each stage to its specific design tolerances, that care is taken while tamping to get the track to its final exact co-ordinates and that welding and stressing is completed as part of the core works.

Network Rail estimates that over US$6.2 million (£5 million) has already been saved by avoiding compensation payments since the start of the high speed handback programme.

For more information on companies in this article

Related Content

  • Kenya WIM system cuts four days off journey times
    March 18, 2014
    Shem Oirere looks at how weigh-in-motion is helping to streamline the trucking industry in Kenya. Kenya, East Africa’s largest economy, is streamlining trucking operations on its section of the 8,800km Northern Corridor. It is both reducing the number of weighbridges and automating the remaining ones in an effort to improve efficiency and eliminate corruption.The Northern Corridor is a major gateway through Kenya to the landlocked countries of Uganda, Rwanda, Burundi, Democratic Republic of Congo and Sou
  • Report highlights positive effects of US diesel emissions reduction program
    March 24, 2016
    Clean diesel grants aimed at cleaning up old diesel engines have greatly improved public health by cutting harmful pollution that causes premature deaths, asthma attacks and missed school and workdays, according to a new report by the US Environmental Protection Agency (EPA). Since its start in 2008, the Diesel Emission Reduction Act (DERA) program has significantly improved air quality for communities across the country by retrofitting and replacing older diesel engines. Diesel exhaust significantly con
  • Smart railways market ‘worth US$13.77 billion by 2020’
    January 15, 2016
    According to new market research report by MarketsandMarkets, the smart railway market is predicted to grow from US$5.34 Billion in 2015 to US$13.77 Billion by 2020, at a CAGR of 20.8 per cent over the period. The smart railways concept includes the combination of advanced solutions and services of intelligent transportation with the information and communication technology. It facilitates the smart use of rail assets, from tracks to trains which will enable companies to meet the increasing consumer dema
  • The proven route to safer roads from iRAP
    July 23, 2024
    Research from Johns Hopkins University suggests nearly 700,000 deaths and severe injuries were prevented over eight years in road safety projects which used the International Road Assessment Programme methodology