Skip to main content

‘Formation flying’ engineering trains used to upgrade railway

In a bid to increase efficiencies and reduce delays for passengers, the UK’s Network Rail is trialling ‘formation flying’ engineering trains to repair and renew the 20,000 miles of railway track it is responsible for maintaining. It says this new approach to engineering could potentially save taxpayer-funded Network Rail US$313,000 (£250,000) per week in costs by allowing trains to run at higher speeds once engineering is complete. The pioneering technique was used successfully at Sandy, Bedfordshire, on
February 16, 2017 Read time: 2 mins
In a bid to increase efficiencies and reduce delays for passengers, the UK’s 5021 Network Rail is trialling ‘formation flying’ engineering trains to repair and renew the 20,000 miles of railway track it is responsible for maintaining. It says this new approach to engineering could potentially save taxpayer-funded Network Rail US$313,000 (£250,000) per week in costs by allowing trains to run at higher speeds once engineering is complete.

The pioneering technique was used successfully at Sandy, Bedfordshire, on a set of railway switches and crossings, which were being replaced as part of the Railway Upgrade Plan.

A pair of engineering trains were joined together connected by an umbilical and ran in parallel to simultaneously deliver tamping and dynamic track stabilisation (DTS) which simulated the equivalent of 200 trains passing over the tracks consecutively. Passenger trains were then able to start using the railway at speeds as high as 125mph as soon as the engineering team had finished because the track and ballast were firmly ‘bedded in’ – which meant Network Rail avoided thousands of pounds in compensation payments.

The news comes almost one year after Network Rail’s first successes with 125mph ‘high speed handbacks’ in January 2016 on regular plain line track. High speed handback ensures track is installed at each stage to its specific design tolerances, that care is taken while tamping to get the track to its final exact co-ordinates and that welding and stressing is completed as part of the core works.

Network Rail estimates that over US$6.2 million (£5 million) has already been saved by avoiding compensation payments since the start of the high speed handback programme.

Related Content

  • June 14, 2018
    Keeping people on track is RATP’s raison d’etre
    In Paris, RATP Group’s autonomous Metro Line 1 is carrying 750,000 people a day across the city. Ben Spencer is invited into the control room to take a look at how the system works Paris is visited by millions of tourists each year, keen to see for themselves stunning attractions such as the Eiffel Tower, Arc de Triomphe, Notre-Dame, the Louvre, the Seine and all the rest. But while the best-known sites of the City of Light tend to be on the surface, there is a lot going on below those iconic grand boule
  • December 16, 2014
    Dynamic charging boosts electric vehicles’ potential
    With an increasing need to use electric vehicles in city centres to reduce pollution, David Crawford looks at various solutions to power delivery. The UN’s September 2014 Climate Summit has added fresh momentum to the drive to increase urban electric vehicle (EV) takeup. It has launched the Urban Electric Mobility Initiative, which wants to see EVs accounting for 30% of all urban travel by 2030, and make cities worldwide more friendly to their use. Encouragingly, the plan is being well supported by commerci
  • January 30, 2012
    Highway safety inspection delivers safer roads, cost savings
    Last year, the County of Lancashire, in the north-west of England, repaired a total of 15,000 potholes on its network of roads. In 2010, that number is likely to significantly increase as Lancashire, along with local authorities throughout the UK, deals with the after-effects of a record cold spell in December and January with prolonged snow, ice and sub-zero temperatures.
  • January 25, 2018
    Enforcement ensures equity for toll road users
    All-electronic tolling boosts traffic flow but introduces the tricky question of enforcement. Workable solutions are starting to emerge. Enforcement is an essential part of tolling and one of the most important ways for a mobility agency to keep faith with its investors, its community stakeholders and the vast majority of its users. It can also be one of the most unpopular and contentious things a toll authority has to undertake. If tolling is about paying for the roads, then everyone has to pay their