Skip to main content

‘Formation flying’ engineering trains used to upgrade railway

In a bid to increase efficiencies and reduce delays for passengers, the UK’s Network Rail is trialling ‘formation flying’ engineering trains to repair and renew the 20,000 miles of railway track it is responsible for maintaining. It says this new approach to engineering could potentially save taxpayer-funded Network Rail US$313,000 (£250,000) per week in costs by allowing trains to run at higher speeds once engineering is complete. The pioneering technique was used successfully at Sandy, Bedfordshire, on
February 16, 2017 Read time: 2 mins
In a bid to increase efficiencies and reduce delays for passengers, the UK’s 5021 Network Rail is trialling ‘formation flying’ engineering trains to repair and renew the 20,000 miles of railway track it is responsible for maintaining. It says this new approach to engineering could potentially save taxpayer-funded Network Rail US$313,000 (£250,000) per week in costs by allowing trains to run at higher speeds once engineering is complete.

The pioneering technique was used successfully at Sandy, Bedfordshire, on a set of railway switches and crossings, which were being replaced as part of the Railway Upgrade Plan.

A pair of engineering trains were joined together connected by an umbilical and ran in parallel to simultaneously deliver tamping and dynamic track stabilisation (DTS) which simulated the equivalent of 200 trains passing over the tracks consecutively. Passenger trains were then able to start using the railway at speeds as high as 125mph as soon as the engineering team had finished because the track and ballast were firmly ‘bedded in’ – which meant Network Rail avoided thousands of pounds in compensation payments.

The news comes almost one year after Network Rail’s first successes with 125mph ‘high speed handbacks’ in January 2016 on regular plain line track. High speed handback ensures track is installed at each stage to its specific design tolerances, that care is taken while tamping to get the track to its final exact co-ordinates and that welding and stressing is completed as part of the core works.

Network Rail estimates that over US$6.2 million (£5 million) has already been saved by avoiding compensation payments since the start of the high speed handback programme.

Related Content

  • December 5, 2014
    Motorists want roads repaired before smart motorways, says survey
    According to research by Bury-based online car supermarket JamJar Direct, which indicates that 47 per cent of Greater Manchester motorists claim to have been affected by the construction works, communications around the M60 smart motorway improvements are sorely lacking. Almost two thirds of Greater Manchester motorists (62 per cent) are aware that the M60 is being turned into a smart motorway, but over 40 per cent, equivalent to 81,000 vehicles per day using affected stretch of M60 between junctions 8 a
  • January 18, 2024
    National Cycle Network plan for freewheeling Ireland
    Routes will link to transport hubs to ensure more comprehensive mobility for people
  • May 27, 2014
    Connecticut Transit uses web feedback to improve user experience
    Connecticut champions open government and open data to help fostertransparency, accountability and citizen engagement – and that includes transportation matters as Andrew Bardin Williams discovers. The last thing anyone wanted was to inconvenience or displace others - least of all people who lived and worked in the neighbourhood. Yet, workers in an office building in downtown New Haven, Conn., were tired of shuffling through hoards of people who kept sitting on the stoop to the building while waiting for th
  • July 4, 2012
    Meeting the challenges of smartcard fare payment
    David Crawford monitors a growing trend in contactless smartcard ticketing The north east United States has become a hive of activity in the smart fare payment arena. In October 2011, the New York Metropolitan Transportation Authority (MTA) published, as a preliminary to an imminent procurement process, the detailed concept of its New Fare Payment System (NFPS). Based on open payment industry standards, this is designed to be implemented on all MTA bus and subway services operated by New York City Transit (