Skip to main content

‘Formation flying’ engineering trains used to upgrade railway

In a bid to increase efficiencies and reduce delays for passengers, the UK’s Network Rail is trialling ‘formation flying’ engineering trains to repair and renew the 20,000 miles of railway track it is responsible for maintaining. It says this new approach to engineering could potentially save taxpayer-funded Network Rail US$313,000 (£250,000) per week in costs by allowing trains to run at higher speeds once engineering is complete. The pioneering technique was used successfully at Sandy, Bedfordshire, on
February 16, 2017 Read time: 2 mins
In a bid to increase efficiencies and reduce delays for passengers, the UK’s 5021 Network Rail is trialling ‘formation flying’ engineering trains to repair and renew the 20,000 miles of railway track it is responsible for maintaining. It says this new approach to engineering could potentially save taxpayer-funded Network Rail US$313,000 (£250,000) per week in costs by allowing trains to run at higher speeds once engineering is complete.

The pioneering technique was used successfully at Sandy, Bedfordshire, on a set of railway switches and crossings, which were being replaced as part of the Railway Upgrade Plan.

A pair of engineering trains were joined together connected by an umbilical and ran in parallel to simultaneously deliver tamping and dynamic track stabilisation (DTS) which simulated the equivalent of 200 trains passing over the tracks consecutively. Passenger trains were then able to start using the railway at speeds as high as 125mph as soon as the engineering team had finished because the track and ballast were firmly ‘bedded in’ – which meant Network Rail avoided thousands of pounds in compensation payments.

The news comes almost one year after Network Rail’s first successes with 125mph ‘high speed handbacks’ in January 2016 on regular plain line track. High speed handback ensures track is installed at each stage to its specific design tolerances, that care is taken while tamping to get the track to its final exact co-ordinates and that welding and stressing is completed as part of the core works.

Network Rail estimates that over US$6.2 million (£5 million) has already been saved by avoiding compensation payments since the start of the high speed handback programme.

For more information on companies in this article

Related Content

  • Give offending drivers credit for good behaviour
    July 27, 2012
    Andrew Rooke and Dave Marples of Technolution B.V. take a look at what can be done to address a long-standing problem: the all-or-nothing approach of automated enforcement. To start, a brief history of speeding: on 14 November 1896, the first Veteran Car Run was staged in England from London to Brighton. It was organised to celebrate new British legislation to raise the maximum speed of vehicles from four to 14mph while also removing the need for a person waving a red flag to walk in front of the car and wa
  • ITSWC 2021: New solutions for the new normal
    September 20, 2021
    October’s ITS World Congress in Hamburg will profile the changing face of mobility, with real-world examples of electric vehicle implementation, shared transport and autonomy taking centre stage
  • Funding to speed innovation in US transportation projects
    December 22, 2014
    US Transportation Secretary Anthony Foxx has announced US$5.37 million in grants from the Federal Highway Administration (FHWA) designed to accelerate deployment of innovative road and bridge work. The funds will be used to offset the cost of pioneering highway project delivery in six states.
  • Ability to keep in touch on US buses woos travellers
    February 1, 2012
    David Crawford finds evidence of a new trend in American intercity travel: that better access to data sources on the move is tempting passengers away from air travel and onto surface modes. In the US the ease of use of Portable Electronic Devices (PEDs) is successfully wooing long-distance travellers away from airlines and onto surface public transport, according to just-published research. Using data from field observations of 7,028 passengers travelling by bus, air and train in 14 US states and the Distri