Skip to main content

Fluor to upgrade Red and Purple rail lines in Chicago

A joint venture team of Fluor and Walsh Construction has been chosen as the preferred partner for phase one of the Red and Purple Line modernisation programme in Chicago. The Chicago Transit Authority is behind the $2.1 billion project, which is expected to improve infrastructure across both lines. The scope of the contract includes the development of new elevated tracks along a 1.9-mile section – featuring new bridges, support structures and existing tracks. Also, 3.2 miles of the signal system will be
December 20, 2018 Read time: 2 mins
A joint venture team of 2248 Fluor and Walsh Construction has been chosen as the preferred partner for phase one of the Red and Purple Line modernisation programme in Chicago.


The Chicago Transit Authority is behind the $2.1 billion project, which is expected to improve infrastructure across both lines.

The scope of the contract includes the development of new elevated tracks along a 1.9-mile section – featuring new bridges, support structures and existing tracks. Also, 3.2 miles of the signal system will be upgraded, and a grade-separated bypass will be built for the Brown Line at Clark Junction.

Aside from Fluor and Walsh, Stantec Consulting Services will provide design expertise for the project.

The initiative will begin in the first quarter of 2019 and is scheduled to be complete in early 2025.

Last year, Fluor was chosen by the Massachusetts Bay Transportation Authority to lead a joint venture for the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external extension false http://www.itsinternational.com/sections/transmart/news/fluor-chosen-to-lead-joint-venture-for-boston-green-line-rail-extension-project/ false false%> of the Green Line Light Rail in Boston.

Related Content

  • November 27, 2018
    Hawaii wins more than $400,000 in EPA Grants
    The US Environmental Protection Agency (EPA) has awarded $411,578 in Diesel Emission Reduction Act (DERA) grants to Hawaii to help curb pollution from diesel vehicle sources. The EPA’s West Coast Collaborative administers the DERA programme. This partnership, which combines the EPA’s Pacific Southwest and Pacific Northwest Regions, utilises public and private funds in a bid to reduce emissions. The Hawaii Department of Health (HDOH) intends to use the grant to replace two diesel transit buses with batter
  • December 4, 2018
    Quantum XYZ intends to launch air taxi service in Los Angeles
    Quantum XYZ is seeking to use SureFly’s eight-rotor hybrid ‘octocopters’ to launch an air taxi service in Los Angeles. SureFly, a subsidiary of US technology company Workhorse, is currently pursuing Federal Aviation Administration (FAA) type certification for its electric vertical take-off and landing (eVTOL) aircraft. Quantum intends to submit an application to become a FAA-certified urban VTOL air carrier. The company’s president, Tony Thompson, says: “Once SureFly receives FAA Type certification, we
  • November 2, 2018
    Conduent to deliver fare collection system to Rotterdam
    Conduent Transportation will deliver 1,700 smartcard ticket validators to Dutch transport company RET in Spring 2019. The technology will be used by commuters on buses and trams in Rotterdam, the Netherlands. Conduent says its VPE 430 validators, integrated with software from IT services provider Sigmax, will allow riders to pay via a Dutch OV Chipkaart public transport payment card as well as bank cards and smartphones with barcodes or near-field communication. In September, the company extended its c
  • February 22, 2019
    Scania and Nobina to trial autonomous buses in Stockholm
    Scania has joined forces with public transport operator Nobina to trial autonomous buses on public roads in Stockholm. Two Scania Citywide LF electric buses will operate in the Barkaby area of the Swedish capital, around 20km from the centre. Both buses will operate along a dedicated 5km route with four stops. , Initially, they will be run in autonomous mode without passengers for a distance of 1km, while second stage tests are expected to carry up to 300 commuters per day. A safety driver will remai