Skip to main content

Fluor-led team selected for South Carolina port access road project

Fluor Corporation’s joint venture team, Fluor-Lane South Carolina, comprising Fluor and The Lane Construction Corporation, has been selected by the South Carolina Department of Transportation (SCDOT) to design and build the Port Access Road Project in Charleston. The Port of Charleston is currently the fastest growing major container port in the US and the new roadway and structure project will provide direct access between the proposed marine container terminal located on the former Naval Base and Intersta
April 28, 2016 Read time: 2 mins

2248 Fluor Corporation’s joint venture team, Fluor-Lane South Carolina, comprising Fluor and 6600 The Lane Construction Corporation, has been selected by the South Carolina Department of Transportation (SCDOT) to design and build the Port Access Road Project in Charleston.

The Port of Charleston is currently the fastest growing major container port in the US and the new roadway and structure project will provide direct access between the proposed marine container terminal located on the former Naval Base and Interstate 26.

The project’s scope will include local roadway enhancements to safely integrate container terminal traffic with existing traffic; support local and regional planning policies and strategies; and minimise adverse impacts on nearby communities, the travelling public and the environment.

The project consists of a new fully directional interchange on I-26, Bainbridge Connector Road, the extension of Stromboli Avenue and associated roadway improvements to surface streets to serve the proposed Naval Base Terminal. Construction is expected to start later this year with completion expected in late 2019.

Related Content

  • April 23, 2012
    AECOM and PB JV for Los Angeles regional connector
    The Los Angeles County Metropolitan Transportation Authority (LACMTA) has selected a joint venture of AECOM and Parsons Brinckerhoff (PB) to provide conceptual planning and preliminary design for the US$1.4 billion Metro Regional Connector Transit corridor project, also known as the Downtown Connector or Downtown Light-Rail Connector.
  • January 25, 2022
    Data helps Ohio DoT get grant money
    Ohio Department of Transportation turned to StreetLight Data when it needed to finalise grant money for a key infrastructure link. David Crawford sees how metrics brought in the cash…
  • September 17, 2013
    Ohio Turnpike infrastructure project funds
    The Ohio Turnpike and Infrastructure Commission (OTIC) has approved the US$930 million funding needed for ten projects in northern Ohio, each within twenty miles of the turnpike. The 241 mile-long, limited-access toll highway serves as a primary corridor to Chicago and Pittsburgh.
  • October 28, 2015
    Emissions reductions targets to have major impact on transport
    As bold moves aimed at reducing greenhouse gas emissions have been introduced in California, David Crawford looks at the ramifications for transportation. California Governor Jerry Brown’s recent dramatic raising of the bar on emissions reduction policy for the state has won him praise from Japan, Australia, Europe and the secretariat of the critical UN conference on climate change being held in Paris in November/December 2015. His April 2015 executive order aimed at bringing emissions to 40% below 1990 lev