Skip to main content

Fluor-led team selected for South Carolina port access road project

Fluor Corporation’s joint venture team, Fluor-Lane South Carolina, comprising Fluor and The Lane Construction Corporation, has been selected by the South Carolina Department of Transportation (SCDOT) to design and build the Port Access Road Project in Charleston. The Port of Charleston is currently the fastest growing major container port in the US and the new roadway and structure project will provide direct access between the proposed marine container terminal located on the former Naval Base and Intersta
April 28, 2016 Read time: 2 mins

2248 Fluor Corporation’s joint venture team, Fluor-Lane South Carolina, comprising Fluor and 6600 The Lane Construction Corporation, has been selected by the South Carolina Department of Transportation (SCDOT) to design and build the Port Access Road Project in Charleston.

The Port of Charleston is currently the fastest growing major container port in the US and the new roadway and structure project will provide direct access between the proposed marine container terminal located on the former Naval Base and Interstate 26.

The project’s scope will include local roadway enhancements to safely integrate container terminal traffic with existing traffic; support local and regional planning policies and strategies; and minimise adverse impacts on nearby communities, the travelling public and the environment.

The project consists of a new fully directional interchange on I-26, Bainbridge Connector Road, the extension of Stromboli Avenue and associated roadway improvements to surface streets to serve the proposed Naval Base Terminal. Construction is expected to start later this year with completion expected in late 2019.

Related Content

  • June 6, 2014
    App informs drivers of delays during Long Beach bridge replacement
    David Crawford previews a work zone travel breakthrough. In February 2014, the Port of Long Beach in California launched what it claims is a groundbreaking construction zone navigation aid - LB Bridge mobile app. The app is designed to help drivers during the Gerald Desmond Bridge replacement programme by keeping them up to date on activity and the ensuing traffic diversions when construction starts in summer 2014. The unusually content-rich app is designed to convey current project news (enlivened by phot
  • July 26, 2013
    Qatar invests $70 billion to pave the way to world beating transportation
    Eng. Zeina Nazer looks at what Qatar’s recently-announced investment in transport infrastructure will mean on the ground. Qatar is experiencing a rapid economic and industrial growth. This growth is characterised by a rapid population increase and by the urgent need towards the development of both infrastructure projects and major transport projects. In order to handle this rate of development within Qatar, Public Works Authority (Ashghal) is developing a fully-integrated multimodal transportation system in
  • January 17, 2013
    Iteris to upgrade South Carolina 511 traveller information services
    Iteris, US-based intelligent traffic management information solutions provider is to upgrade and operate the South Carolina Department of Transportation (SCDOT) next generation 511 Traveler Information System. The company has been awarded a three-year contract, valued at approximately US$2.5 million, including two one-year options for ongoing operation and maintenance. Work on the project is planned to begin immediately. A component of the award includes IterisPeMS (iPeMS), a state-of-the-art system that a
  • July 29, 2016
    WSP/Parsons Brinckerhoff named general engineering consultant for US road extension
    The Washington State Department of Transportation (WSDOT) has awarded a contract to WSP/Parsons Brinckerhoff to serve as general engineering consultant on a planned extension of SR 167 in Tacoma. The project will provide a better freight connection between the Port of Tacoma and the Puyallup/White River Valley and also link industrial and urban centres. SR 167 will be extended four miles westward to connect with I-5 and then continue an additional two miles as the SR 509 spur to connect with SR 509 near