Skip to main content

Fluor-led team selected for South Carolina port access road project

Fluor Corporation’s joint venture team, Fluor-Lane South Carolina, comprising Fluor and The Lane Construction Corporation, has been selected by the South Carolina Department of Transportation (SCDOT) to design and build the Port Access Road Project in Charleston. The Port of Charleston is currently the fastest growing major container port in the US and the new roadway and structure project will provide direct access between the proposed marine container terminal located on the former Naval Base and Intersta
April 28, 2016 Read time: 2 mins

2248 Fluor Corporation’s joint venture team, Fluor-Lane South Carolina, comprising Fluor and 6600 The Lane Construction Corporation, has been selected by the South Carolina Department of Transportation (SCDOT) to design and build the Port Access Road Project in Charleston.

The Port of Charleston is currently the fastest growing major container port in the US and the new roadway and structure project will provide direct access between the proposed marine container terminal located on the former Naval Base and Interstate 26.

The project’s scope will include local roadway enhancements to safely integrate container terminal traffic with existing traffic; support local and regional planning policies and strategies; and minimise adverse impacts on nearby communities, the travelling public and the environment.

The project consists of a new fully directional interchange on I-26, Bainbridge Connector Road, the extension of Stromboli Avenue and associated roadway improvements to surface streets to serve the proposed Naval Base Terminal. Construction is expected to start later this year with completion expected in late 2019.

Related Content

  • May 26, 2017
    Technavio names top 5 vendors in the global smart highway construction market 2017-2021
    Technology research company Technavio has announced the top five leading vendors in their recent global smart highway construction market 2017-2021 report. This market research report also lists 14 other prominent vendors that are expected to impact the market during the forecast period. According to the report, the smart highway construction market will grow at an exponential rate and post a CAGR of almost 94 per cent by 2021. The vendors in this market can expect significant market growth in the coming ye
  • December 5, 2018
    Dynamic messaging has its drawbacks
    Dynamic message signs are a proven means of getting information to drivers on the road – but they have their drawbacks. Robert Gordon looks at the possibilities of expanding DMS capability by bringing that information into the cars themselves Delivery of traffic information to motorists by dynamic message signs (DMS) has proven to be popular and is a principal tool for conveying information developed by the traffic management centre (TMC) to the public. There are, however, limitations in the use of ph
  • April 11, 2017
    JV wins multi-billion dollar West Gate Tunnel project
    CPB Contractors has been selected by Australian toll road operator Transurban as the preferred contractor to deliver Victoria’s multi-billion dollar West Gate Tunnel Project in a joint venture with John Holland. The West Gate Tunnel Project will address a number of critical challenges in relation to traffic, growth and liveability across Melbourne. Design and construction works include widening the West Gate Freeway from eight lanes to 12 between the M80 Ring Road and Williamstown Road, as well as bui
  • July 31, 2012
    Dubai metro - the world's longest automated rail system
    David Crawford reviews the recent opening of Dubai's Red Line. The US$7.6bn Dubai Metro, the Phase I Red Line of which started partial operation in September 2009, will be the world's longest driverless rail system on its planned completion in 2011. With a total length of some 75km, it will then overtake the 68.7km Vancouver SkyTrain and be able to carry over 1.2 million passengers on a typical day.