Skip to main content

Fluor-led team selected for South Carolina port access road project

Fluor Corporation’s joint venture team, Fluor-Lane South Carolina, comprising Fluor and The Lane Construction Corporation, has been selected by the South Carolina Department of Transportation (SCDOT) to design and build the Port Access Road Project in Charleston. The Port of Charleston is currently the fastest growing major container port in the US and the new roadway and structure project will provide direct access between the proposed marine container terminal located on the former Naval Base and Intersta
April 28, 2016 Read time: 2 mins

2248 Fluor Corporation’s joint venture team, Fluor-Lane South Carolina, comprising Fluor and 6600 The Lane Construction Corporation, has been selected by the South Carolina Department of Transportation (SCDOT) to design and build the Port Access Road Project in Charleston.

The Port of Charleston is currently the fastest growing major container port in the US and the new roadway and structure project will provide direct access between the proposed marine container terminal located on the former Naval Base and Interstate 26.

The project’s scope will include local roadway enhancements to safely integrate container terminal traffic with existing traffic; support local and regional planning policies and strategies; and minimise adverse impacts on nearby communities, the travelling public and the environment.

The project consists of a new fully directional interchange on I-26, Bainbridge Connector Road, the extension of Stromboli Avenue and associated roadway improvements to surface streets to serve the proposed Naval Base Terminal. Construction is expected to start later this year with completion expected in late 2019.

Related Content

  • March 25, 2019
    Fluor and partners to build and operate LAX Automated People Mover
    Fluor and its partners are to construct and operate the Los Angeles International Airport’s (LAX) Automated People Mover, a project valued $4.9 billion, over the next 30 years. The announcement follows the completion of a pre-construction phase carried out by Fluor and its LAX Integrated Express Solutions (LINXS) team on behalf of Los Angeles World Airports. The line is expected to offer a rider capacity of up to 10,000 passengers per hour once it is operational in 2023. Terence Easton, president
  • December 12, 2016
    Meridiam consortium named preferred proposer for Virginia's transform 66 project
    A consortium of Meridiam, Cintra, Ferrovial Agroman US, Allan Myers VA, Janssen & Spaans Engineering, the Louis Berger Group and American Structurepoint has been named Preferred Proposer by the Commonwealth of Virginia for the State’s Transform 66 Project. I-66 Express Mobility Partners will design, build, finance, maintain and operate the I-66 Outside the Beltway project under the Public Private Partnership (P3) Transportation Act. The project is designed to relieve congestion, improve safety and provi
  • August 1, 2016
    Latest round of TIGER funding announced
    Nearly US$500 million will be made available for transportation projects across the US in the eighth round of the highly successful and competitive Transportation Investment Generating Economic Recovery (TIGER) grant program. Announcing the funding, US Transportation Secretary Anthony Foxx highlight how this will improve safety and economic opportunity in two US territories, 32 states and 40 communities across the country. This year’s TIGER awards include US$19 million to Pittsburgh, Pennsylvania fo
  • February 14, 2014
    Parsons Brinckerhoff to provide quality control for Cleveland bridge
    Parsons Brinckerhoff is part of the winning design-build team selected by the Ohio Department of Transportation (ODOT) to provide design and construction for the new George V. Voinovich, I-90 Cleveland Inner belt Eastbound Bridge project. Led by the TGR joint venture, comprising Trumbull Corporation, the Great Lakes Construction Company, and the Ruhlin Company, Parsons Brinckerhoff is serving as the independent quality firm (IQF). The eastbound bridge is part of a phased project that will ultimately de