Skip to main content

Fluor chosen to lead joint venture for Boston Green Line rail extension project

Fluor Corporation (FC) has been selected by the Massachusetts Bay Transportation Authority (MBTA) to lead a joint venture for the Green Line Light Rail Extension in Boston, valued $2 billion (£1.5 billion). The project aims to provide a local and regional mobility one-seat ride to downtown Boston, address transportation concerns, reduce the number of automobiles on local roads and combat air pollution.
November 23, 2017 Read time: 2 mins
2248 Fluor Corporation (FC) has been selected by the 5200 Massachusetts Bay Transportation Authority (MBTA) to lead a joint venture for the Green Line Light Rail Extension in Boston, valued $2 billion (£1.5 billion). The project aims to provide a local and regional mobility one-seat ride to downtown Boston, address transportation concerns, reduce the number of automobiles on local roads and combat air pollution.


Working with MBTA, the project includes seven new stations including the relocated Lechmere Station, and a vehicle storage and maintenance facility and two distinct branches. In addition, it will feature a mainline branch operating within the existing right-of-way for the MBTA Lowell Line beginning at a relocated Lechmere Station in Cambridge and travelling north to Medford. A branch line operating within the existing right-of-way for the MBTA Fitchburg Line to Union Square in Somerville will also be included.

Extension of the Green Line will also support municipal plans for urban redevelopment and provide residents with faster journeys to jobs and other destinations. Its projected daily ridership is estimated to be 45,000 by 2030.

The joint venture also includes 3902 Balfour Beatty Infrastructure, Inc, Herzog Contracting Group and The Middlesex Corp.

FC will book its share of the contract value into backlog in the fourth quarter of 2017, and the project is slated to begin construction in 2018 and open for service in late 2021.

Related Content

  • December 5, 2017
    New Mersey crossing ends Halton’s congestion misery
    Plagued by intolerable congestion but denied government funding for its solution, tiny Halton Borough Council relentlessly pursued its vision and achieved what many believed impossible. Halton may be a small local authority in north west England, but it had a big traffic problem. However, as the road, or more particularly the bridge, involved was not deemed a strategic route, central government would not commission or even fund a solution - a problem that many other local authorities will recognise.
  • October 27, 2017
    Cubic wins contract from MTA to replace MetroCard with new fare payment system
    Cubic Transportation Systems (CTS) has been chosen for a contract valued, $539.5 million (£409.4 million) with additional options worth $33.9 million (£25.7 million), by the New York Metropolitan Transportation Authority (MTA) to replace the MetroCard with a fare payment system similar to Transport for London (TfL). The new system is designed with the intention of providing an enhanced and integrated travel experience across the region including seamless access to Long Island Rail Road (LIRR) and Metro-Nort
  • August 28, 2015
    Siemens to automate New York’s Queens Boulevard subway
    Siemens has been awarded a US$156 million contract by the Metropolitan Transportation Authority (MTA) to install communications-based train control (CBTC) on the Queens Boulevard Line, one of the busiest subway lines on the New York City transit system. Siemens is supplying the onboard equipment for a total of 305 trains and installing the wayside signalling technology at seven of eight field locations.
  • September 20, 2017
    Knoxville chooses Siemens for city-wide streetlight retrofit
    Siemens has been chosen by the City of Knoxville, Tennessee to retrofit nearly 30,000 streetlights with new energy efficient light-emitting diodes (LEDs). The retrofit is estimated to cut the City’s streetlight operation budget in half by saving US$2 million annually in energy and maintenance costs and is expected to pay for itself in less than ten years.