Skip to main content

Fluor chosen to lead joint venture for Boston Green Line rail extension project

Fluor Corporation (FC) has been selected by the Massachusetts Bay Transportation Authority (MBTA) to lead a joint venture for the Green Line Light Rail Extension in Boston, valued $2 billion (£1.5 billion). The project aims to provide a local and regional mobility one-seat ride to downtown Boston, address transportation concerns, reduce the number of automobiles on local roads and combat air pollution.
November 23, 2017 Read time: 2 mins
2248 Fluor Corporation (FC) has been selected by the 5200 Massachusetts Bay Transportation Authority (MBTA) to lead a joint venture for the Green Line Light Rail Extension in Boston, valued $2 billion (£1.5 billion). The project aims to provide a local and regional mobility one-seat ride to downtown Boston, address transportation concerns, reduce the number of automobiles on local roads and combat air pollution.


Working with MBTA, the project includes seven new stations including the relocated Lechmere Station, and a vehicle storage and maintenance facility and two distinct branches. In addition, it will feature a mainline branch operating within the existing right-of-way for the MBTA Lowell Line beginning at a relocated Lechmere Station in Cambridge and travelling north to Medford. A branch line operating within the existing right-of-way for the MBTA Fitchburg Line to Union Square in Somerville will also be included.

Extension of the Green Line will also support municipal plans for urban redevelopment and provide residents with faster journeys to jobs and other destinations. Its projected daily ridership is estimated to be 45,000 by 2030.

The joint venture also includes 3902 Balfour Beatty Infrastructure, Inc, Herzog Contracting Group and The Middlesex Corp.

FC will book its share of the contract value into backlog in the fourth quarter of 2017, and the project is slated to begin construction in 2018 and open for service in late 2021.

For more information on companies in this article

Related Content

  • Wayne State University to open advanced mobility centre
    August 20, 2019
    Wayne State University in Michigan is to open a centre for advanced mobility to offer more degrees and certificates in autonomous driving, smart infrastructure and electrification. Farshad Fotouhi, dean of the Wayne State College of Engineering and Computer Science professor, says: “The Center for Advanced Mobility will be the epicenter for academic and start-up activity in the mobility sector for students, researchers, and global corporate partners in Detroit.” The Center for Advanced Mobility will utili
  • Major road projects to improve journeys in Merseyside and Cheshire
    September 1, 2017
    Two major new road schemes worth more than US$388 million (£300 million) are set to cut congestion and improve journey times for hundreds of thousands of drivers in Merseyside and Cheshire, UK. Highways England has set out its preferred options for upgrading the key route to the Port of Liverpool and creating a new junction on the M56 near Runcorn following public consultations earlier this year.
  • Russia's high speed toll link - aims and opportunities
    July 31, 2012
    Construction of a new toll link between the Russian capital of Moscow and the country's second-largest city, the port of St Petersburg, is due to start in 2012. Here, ITS International takes look at the project to date and the opportunities for foreign companies to get involved. The construction of a new toll link between the Russian capital Moscow and the country's second-largest city St Petersburg has a number of aims. It will lead to the creation of a high-speed vehicular link between the two which will
  • Finnish light rail contract awarded
    December 1, 2016
    Finnish organisations Pöyry, YIT and VR Track are to implement the Tampere light rail project on behalf of the City of Tampere for the implementation of the Tampere light rail project. The revised cost estimate for the implementation stage is US$2154.5 million (€238.8 million). The first phase of construction will commence in the first half of 2017 and is expected be complete by 2021. During this phase, the new rail line will be extended by 15 kilometres and a depot will be constructed in Hervanta. The