Skip to main content

Fluor chosen to lead joint venture for Boston Green Line rail extension project

Fluor Corporation (FC) has been selected by the Massachusetts Bay Transportation Authority (MBTA) to lead a joint venture for the Green Line Light Rail Extension in Boston, valued $2 billion (£1.5 billion). The project aims to provide a local and regional mobility one-seat ride to downtown Boston, address transportation concerns, reduce the number of automobiles on local roads and combat air pollution.
November 23, 2017 Read time: 2 mins
2248 Fluor Corporation (FC) has been selected by the 5200 Massachusetts Bay Transportation Authority (MBTA) to lead a joint venture for the Green Line Light Rail Extension in Boston, valued $2 billion (£1.5 billion). The project aims to provide a local and regional mobility one-seat ride to downtown Boston, address transportation concerns, reduce the number of automobiles on local roads and combat air pollution.


Working with MBTA, the project includes seven new stations including the relocated Lechmere Station, and a vehicle storage and maintenance facility and two distinct branches. In addition, it will feature a mainline branch operating within the existing right-of-way for the MBTA Lowell Line beginning at a relocated Lechmere Station in Cambridge and travelling north to Medford. A branch line operating within the existing right-of-way for the MBTA Fitchburg Line to Union Square in Somerville will also be included.

Extension of the Green Line will also support municipal plans for urban redevelopment and provide residents with faster journeys to jobs and other destinations. Its projected daily ridership is estimated to be 45,000 by 2030.

The joint venture also includes 3902 Balfour Beatty Infrastructure, Inc, Herzog Contracting Group and The Middlesex Corp.

FC will book its share of the contract value into backlog in the fourth quarter of 2017, and the project is slated to begin construction in 2018 and open for service in late 2021.

For more information on companies in this article

Related Content

  • Roads and bridges projects in Middle East valued at US$109 million
    September 30, 2013
    Ahead of December’s Gulf Traffic exhibition in Dubai, the latest figures from Ventures Middle East indicate ongoing roads and bridges projects across the Gulf Co-operation Council (GCC) region are currently valued at US$109 billion. Host of the 2022 Football World Cup, Qatar, leads the way with an allocation of US$20bn for roads and highways, in addition to a US$35bn rail network. The UAE, second worldwide for roads quality in the latest Travel and Tourism Competitiveness Report, has investments worth
  • Consortium wins Mexico rail project
    November 27, 2014
    A consortium led by Spanish engineering firm CAF and comprising partners Construcciones Ferrovías y Subsistemas, Thales, Corsan-Corvian Construcción, Isolux and Construcciones Urales has been awarded the US$993 million contract for the Mexico City-Toluca railway. The contract involves the provision of electric trains, rail and communication infrastructure, ticketing facilities and associated services. The trains will travel at speeds of up to 160km/h along the 57.7 kilometre route between Observatorio
  • Consortium to study UK eHighway feasibility 
    August 11, 2021
    Partners including Siemens hope overhead electricity lines will serve major roads by 2030s
  • Strabag consortium to build section of S5 expressway in Poland
    August 6, 2014
    A consortium consisting of Strabag subsidiary Heilit+Woerner and Budimex is to build a 48 kilometre section of the S5 expressway between Poznań and Wrocław in Poland. Work on the US$185 million project is due to begin in around four weeks and is expected to last 30 months. Completion and commissioning of the new section are scheduled for 2017.