Skip to main content

Fluor and partners to build and operate LAX Automated People Mover

Fluor and its partners are to construct and operate the Los Angeles International Airport’s (LAX) Automated People Mover, a project valued $4.9 billion, over the next 30 years. The announcement follows the completion of a pre-construction phase carried out by Fluor and its LAX Integrated Express Solutions (LINXS) team on behalf of Los Angeles World Airports. The line is expected to offer a rider capacity of up to 10,000 passengers per hour once it is operational in 2023. Terence Easton, president
March 25, 2019 Read time: 2 mins
2248 Fluor and its partners are to construct and operate the Los Angeles International Airport’s (LAX) Automated People Mover, a project valued $4.9 billion, over the next 30 years.


The announcement follows the completion of a pre-construction phase carried out by Fluor and its LAX Integrated Express Solutions (LINXS) team on behalf of Los Angeles World Airports.

The line is expected to offer a rider capacity of up to 10,000 passengers per hour once it is operational in 2023.

Terence Easton, president of Fluor’s infrastructure business, says: “This project is a signature piece of mega infrastructure that will be ready to welcome the 2028 Summer Olympics, will improve mobility for travellers from around the world.”

The project includes the construction of six stations along a 2.25 mile guideway where driverless vehicles will transport passengers every two minutes during peak periods.

Aside from Fluor, other members in the LINX team include design and construction partners ACS Infrastructure Development, Dragados USA, Flatiron, Hochtief PPP Solutions as well as Balfour Beatty and Bombardier Transportation.

For more information on companies in this article

Related Content

  • Success of Kuala Lumpur's dual purpose tunnel
    September 12, 2012
    Malaysia’s capital boasts a unique piece of infrastructure; a combined stormwater and motorway tunnel, the longest multi-purpose tunnel in the world. Kuala Lumpur’s Stormwater Management and Road Tunnel (Smart) was conceived as a project under the Malaysian Federal Government to alleviate the flooding problem in the city centre. Although a booming city and the nerve centre for Malaysia’s economy, KL was built along the flood plains of the Klang River and, since its earliest days has been subjected to floodi
  • Major rail contracts for Thales
    September 18, 2012
    Thales has announced the award of two major rail system contracts in Slovenia and China. The first, a US€40 million contract with the Slovenian Transport Ministry is for the provision of a complete European Train Control System (ETCS) Level 1 on the Slovenian part of Corridor D. Due for completion in 2015, this project in partnership with GH Holding concerns the 350 km line stretching from the Hungarian border to Italy. The company says this contract represents one of the most important ETCS Level 1 infras
  • Intelligent parking guidance relieves congestion, reduces costs
    July 24, 2012
    O R Tambo International Airport, near the city of Johannesburg, is the largest airport in Africa. It serves as the primary airport for domestic and international travel to/from South Africa and is one of 10 airports operated by Airports Company South Africa (ACSA). This airport places a massive demand on road infrastructure and parking facilities since a majority of travellers get to the airport by motor vehicle. The demand for parking left many people searching for a parking space for eight minutes or more
  • Pricing practise for HOT lane operation
    May 11, 2017
    Timothy Compston weighs up the critical elements that keep the wheels of dynamic pricing schemes turning in today's high-occupancy toll (HOT) lanes. In the drive towards smarter tolling it is perhaps not surprising that sophisticated pricing algorithms are being rolled out to better reflect supply and demand on the roadway. This is the case with high-occupancy toll (HOT) lanes which a growing number of DoTs are seeing as a way of smoothing the operation of their existing, and planned, freeway infrastructure