Skip to main content

Fluor and partners to build and operate LAX Automated People Mover

Fluor and its partners are to construct and operate the Los Angeles International Airport’s (LAX) Automated People Mover, a project valued $4.9 billion, over the next 30 years. The announcement follows the completion of a pre-construction phase carried out by Fluor and its LAX Integrated Express Solutions (LINXS) team on behalf of Los Angeles World Airports. The line is expected to offer a rider capacity of up to 10,000 passengers per hour once it is operational in 2023. Terence Easton, president
March 25, 2019 Read time: 2 mins
2248 Fluor and its partners are to construct and operate the Los Angeles International Airport’s (LAX) Automated People Mover, a project valued $4.9 billion, over the next 30 years.


The announcement follows the completion of a pre-construction phase carried out by Fluor and its LAX Integrated Express Solutions (LINXS) team on behalf of Los Angeles World Airports.

The line is expected to offer a rider capacity of up to 10,000 passengers per hour once it is operational in 2023.

Terence Easton, president of Fluor’s infrastructure business, says: “This project is a signature piece of mega infrastructure that will be ready to welcome the 2028 Summer Olympics, will improve mobility for travellers from around the world.”

The project includes the construction of six stations along a 2.25 mile guideway where driverless vehicles will transport passengers every two minutes during peak periods.

Aside from Fluor, other members in the LINX team include design and construction partners ACS Infrastructure Development, Dragados USA, Flatiron, Hochtief PPP Solutions as well as Balfour Beatty and Bombardier Transportation.

For more information on companies in this article

Related Content

  • Thales to modernise Egyptian railways signalling systems
    May 29, 2013
    In a contract valued at over US$141 million with Egyptian National Railways, Thales is to modernise the signalling systems on the Cairo-Alexandria corridor. The Cairo-Alexandria railway line is approximately 208 km long and is currently the busiest section of the Egyptian Railways network, carrying more than 25 million passengers per year. The turnkey contract includes design, supply, construction, phasing, commissioning and maintenance services. It covers the modernisation of the signalling as well as the
  • Bombardier to build additional cars for Vancouver’s SkyTrain
    January 3, 2017
    TransLink, Metro Vancouver’s regional transportation authority, has ordered an additional 28 Bombardier INNOVIA Metro 300 vehicles for service on the city’s SkyTrain network. The order is valued at US$69 million and production is scheduled to start in the third quarter of 2017 and final delivery is expected in the fourth quarter of 2018. The new vehicles will support TransLink’s efforts to open new lines and provide additional capacity, by carrying up to 3,640 more people on the SkyTrain network at a tim
  • HS2 ‘crucial to Britain’s future transport needs’
    October 30, 2013
    Britain cannot meet its future transport needs without HS2, according to new evidence published by the government. Even with over US$80 billion of planned transport investment over the next six years the country’s railways will be overwhelmed. The strategic case for HS2 sets out in detail the need for a new railway line to provide the vitally needed extra capacity. Central to the case is new data that reveals the true extent of the crisis facing the UK rail network and the impact alternatives to buildin
  • Louis Berger awarded Mumbai Metro Line four contract
    April 12, 2018
    The Mumbai Metropolitan Region Development Authority (MMRDA) has awarded Louis Berger the project management and construction management contract to work alongside a consortium for the city’s Metro Line 4. Once completed, the service is expected to reduce travel times between Wadala and Kasarvadavali by up to 75%. Line 4, expected to cost ₹15,549 crore ($1.59bn), will be a 32.3-kilometer long elevated corridor with 32 stations. The route will offer interconnectivity between the eastern expressway, central