Skip to main content

Florida DOT project awarded Envision Platinum sustainable infrastructure rating

The I-4 Ultimate Improvement Project in central Florida has been awarded Envision Platinum recognition from the Institute for Sustainable Infrastructure (ISI) for its sustainability efforts in the environmental, social and economic impact on the community and the 21-mile I-4 reconstruction project. I-4 Mobility Partners (I-4MP), the public-private partnership (P3) rebuilding Interstate 4 through Central Florida, received the award for its ongoing programs to minimise environmental impacts, while also fa
January 13, 2017 Read time: 2 mins
The I-4 Ultimate Improvement Project in central Florida has been awarded Envision Platinum recognition from the Institute for Sustainable Infrastructure (ISI) for its sustainability efforts in the environmental, social and economic impact on the community and the 21-mile I-4 reconstruction project.

I-4 Mobility Partners (I-4MP), the public-private partnership (P3) rebuilding Interstate 4 through Central Florida, received the award for its ongoing programs to minimise environmental impacts, while also facilitating the use of alternative transportation by integrating rail projects and improving pedestrian crossings and connections with bike trails.

The project involves the reconstruction of 21 miles of roadway infrastructure and is expected to transform the region by better connecting communities, improving the local economy and enhancing liveability for residents.

One of the most important benefits will be the improvement of traffic flow by easing congestion with the addition of four new variable toll express lanes and the reconstruction of 15 major interchanges, which includes widening 13 bridges, replacing 74 bridges and adding 53 new bridges, along with a pedestrian overpass and a pedestrian bridge. When complete, the project will provide a visually appealing signature corridor with bold landscaping, accent lighting, enhanced bridge architecture and other aesthetic features.

Related Content

  • Transmax trials emergency vehicle ‘green wave’
    December 6, 2013
    Existing equipment used in Australian emergency vehicle ‘green wave’ trial. Despite the lights and sirens, accidents between the motoring public and emergency vehicles on their way to/from the scene of an incident are relatively frequent. Figures from various sources indicate that road accidents are the second most frequent cause of death for on-duty fire fighter fatalities and that more than 90% of ambulance and fire engine accidents occur when the lights are on and the sirens wailing. Other studies indica
  • Welcome to Digital, Free Flow Tolling
    April 17, 2024
    Emovis’ work in the Netherlands demonstrates many benefits of free flow tolling as Benoît Rossi, director of business development at Emovis, an Abertis-owned entity, highlights
  • How public transit improves quality of life
    June 29, 2022
    There are various reasons why Mobility as a Service is catching on more in Europe than the US – but there are still other ways in which access to mobility can be improved across the states, finds Gordon Feller
  • Ground-breaking neutral V2X platform for C-ITS
    June 7, 2021
    Monotch's TLEX can be used by multiple stakeholders across C-ITS ecosystem