Skip to main content

First ScotRail unveils smartcard plan

In the UK, rail operator First ScotRail plans to install 140 smartcard validation machines across seventy of the 350 stations in Scotland, focusing on the Aberdeen, Stirling and Strathclyde areas. The technology was installed in twenty-seven stations at the end of 2012, and should be implemented in the remaining stations in the next three months. Building on a pilot scheme for annual season-ticket holders that has been running between Edinburgh and Glasgow on the line through Falkirk since 2011, the move wi
January 9, 2013 Read time: 2 mins
In the UK, rail operator First 7078 ScotRail plans to install 140 smartcard validation machines across seventy of the 350 stations in Scotland, focusing on the Aberdeen, Stirling and Strathclyde areas.

The technology was installed in twenty-seven stations at the end of 2012, and should be implemented in the remaining stations in the next three months.

Building on a pilot scheme for annual season-ticket holders that has been running between Edinburgh and Glasgow on the line through Falkirk since 2011, the move will mean that the stations will have the same integrated transport smartcard organisation technology installed in most of the country's buses.

Deputy First Minister Nicola Sturgeon revealed a so-called Saltire card vision in October, which the 2112 Scottish Government envisages would work in the same way as the Oyster card in London, with the eventual aim of smartcards being used on all journeys by train, bus, subway, tram and ferry in Scotland.

First Group has a duty to roll out a smartcard service as part of its seven-year ScotRail franchise, which is due for renewal this year. However, the service is at least a year behind the target the company publicly set itself in 2009 and it is not yet clear when the service will be expanded to the rest of the rail network.

Together with a two-year contract to manage the service, this stage of the project is expected to cost Aberdeen-based First Group up to US$1.3 million. The Glasgow-Edinburgh pilot is being managed by Japanese group, 5163 Fujitsu.

A spokesman for First Group said: "All seventy stations will have the validators by 31 March this year. They will be operational on dates to be announced in due course."

For more information on companies in this article

Related Content

  • Pilot for 50 mph limit for HGVs on A9
    December 6, 2013
    Scottish transport minister Keith Brown has announced plans for a 50 mph heavy goods vehicle (HGV) pilot to be introduced at the same time as average speed cameras on Scotland’s A9 road. The trial, which aims to improve the safety and operational performance the route, will go ahead next year alongside a safe driving campaign run by the haulage industry and the A9 Safety Group. In advance of the pilot, the Road Haulage Association will step up their efforts to ensure lorry drivers adhere to safe drivi
  • Washington State’s Community Transit launches real time bus information
    October 25, 2012
    Community Transit in Washington State in the US is equipping all its buses with GPS, automatic passenger counters and other technology that will improve operations, enhance the customer experience, and eventually allow customers to get real-time bus information by phone, computer or mobile device. The Transit Technologies pilot project was launched on a small set of commuter buses to downtown Seattle
  • Growing passenger numbers, fare rises for UK rail
    December 16, 2014
    According to Rail Travel, a new market report from business intelligence provider Key Note, in 2013/2014 the total value of passenger receipts for UK rail travel increased by 6.2 per cent year-on-year, and grew by 32.5 per cent over a five-year period. In addition, passenger journeys grew by 23.5 per cent over the five-year review period, with passenger kilometres travelled also growing by 17.9 per cent over the same timeframe. For the purpose of this report, the rail industry in the UK has been split in
  • Translink launches ticketing system for Glider bus network
    September 19, 2018
    Translink has unveiled its future ticketing system at the launch of the Glider bus rapid transit network in Belfast. The technology will allow riders with more flexible options to pay for journeys, the company says. Riders will be able to pay with cash, smartcard and contactless payment cards, mobile payments, online accounts and Translink smart cards. Flowbird developed the system and a back-office architecture called CloudFare. It is intended to allow administrators to monitor and control ticketing