Skip to main content

First ScotRail unveils smartcard plan

In the UK, rail operator First ScotRail plans to install 140 smartcard validation machines across seventy of the 350 stations in Scotland, focusing on the Aberdeen, Stirling and Strathclyde areas. The technology was installed in twenty-seven stations at the end of 2012, and should be implemented in the remaining stations in the next three months. Building on a pilot scheme for annual season-ticket holders that has been running between Edinburgh and Glasgow on the line through Falkirk since 2011, the move wi
January 9, 2013 Read time: 2 mins
In the UK, rail operator First 7078 ScotRail plans to install 140 smartcard validation machines across seventy of the 350 stations in Scotland, focusing on the Aberdeen, Stirling and Strathclyde areas.

The technology was installed in twenty-seven stations at the end of 2012, and should be implemented in the remaining stations in the next three months.

Building on a pilot scheme for annual season-ticket holders that has been running between Edinburgh and Glasgow on the line through Falkirk since 2011, the move will mean that the stations will have the same integrated transport smartcard organisation technology installed in most of the country's buses.

Deputy First Minister Nicola Sturgeon revealed a so-called Saltire card vision in October, which the 2112 Scottish Government envisages would work in the same way as the Oyster card in London, with the eventual aim of smartcards being used on all journeys by train, bus, subway, tram and ferry in Scotland.

First Group has a duty to roll out a smartcard service as part of its seven-year ScotRail franchise, which is due for renewal this year. However, the service is at least a year behind the target the company publicly set itself in 2009 and it is not yet clear when the service will be expanded to the rest of the rail network.

Together with a two-year contract to manage the service, this stage of the project is expected to cost Aberdeen-based First Group up to US$1.3 million. The Glasgow-Edinburgh pilot is being managed by Japanese group, 5163 Fujitsu.

A spokesman for First Group said: "All seventy stations will have the validators by 31 March this year. They will be operational on dates to be announced in due course."

For more information on companies in this article

Related Content

  • Conduent brings account-based ticketing to Victoria
    May 19, 2023
    Myki public transit payment system will be upgraded to account-based model
  • Hitachi Rail Europe wins UK first traffic management contract
    July 28, 2015
    Passengers on some of the busiest commuter lines in the UK can look forward to more frequent and more reliable trains following a deal to provide new traffic management technology on the Thameslink route through central London. Network Rail and the Thameslink Programme have signed a contract with Hitachi Rail Europe (HRE) to deliver a step-change in technology through state-of-the-art traffic management technology.
  • Building the case for photo enforcement
    October 26, 2016
    As red light enforcement is returning to some intersections and being shut down at others, new evidence has been released backing the safety campaigners, reports Jon Masters. In 2014, 709 Americans were killed in red-light-running crashes and an estimated 126,000 were injured according to the Insurance Institute for Highway Safety (IIHS).
  • London needs just one road user charge, says report
    July 8, 2019
    London’s patchwork of road charging schemes should be replaced by a single, distance-based user charge, according to new research. Apart from anything else, it would be much fairer… The UK capital’s multiple road charging schemes require a radical overhaul, according to a new report by the Centre for London thinktank. The suggested solution is to replace existing levies on drivers with a single, distance-based user charge which would more fairly reflect how much, and at what time, people are using London